Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of s) <br /> VilL MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If a monitoring panel is used to perform leak detection monitoring. Y III,IIIN NA <br /> Are the visual and audible alarms operational? ❑ El <br /> Were all sensors visually inspected for kinks and breaks In the cables and for residual buildup to ensure that floats move freely, © ❑ ❑ <br /> functionally tested , and confirmed operational? ' <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ❑ ❑ <br /> proper operation? I <br /> ElWas monitoring system set-up reviewed to ensure proper settings? <br /> Was (he monitoring panel's backup battery visually inspected , functionally tested, and confirmed operational? ® El <br /> Does the flow of fuel stop at the dispenser If a leak Is detected in the underpolspenser containment? El El <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system falls to operate or is electrically ,d ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary contalnme t�monitoring ystem detects a leak? ®� ❑ El <br /> Which sensors initiate positive shut down? (Check all Ilia ( apply.) Sump Under4spgnser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e . g . modem) operational? ❑ ❑ 1 ❑ <br /> ror finZ answer of "N" above, describe In section IX how and when these deffclencles were or will he corrected. <br /> IX . COMMENTS <br /> X . IN-TANK GAUGING. TESTING <br /> Cyt Check this box if tank gauging is used only for Inventory control. (Do not complete this section.) Y N NA <br /> (l Check this box if NO tank gauging equipment is Installed. (Do not complete this section.) <br /> 'rills section must be completed if inmitankgauging is used to perforra leak detection monitorin . <br /> I-las all Input wiring been inspected for kinks and breaks In the cables and for proper entry and termination , including testing for ground ❑ ❑ ❑ <br /> faults ? _ <br /> Were all ItHank gauging probes visually Inspected for damage and reDidue buildup to ensure that floats move freely, functionally tested , ❑ ❑ ❑ <br /> and confirmed operational? <br /> El <br /> Was accuracy of system's product level readings tested? ❑ El <br /> Was accuracy of system's water level readings tested? EI El El <br /> Were all probes reinstalled properly? ❑ <br /> Were all items on the equipment manufacturer`s maintenance checklist completed? Ell ❑ ❑ <br /> For any answer of "N " above describe in section XI now and when these deffclencies were or will be corrected. <br /> XI . COMMENTS <br /> i <br /> Y Yes. N = No, NA Not Applicable <br />