Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> Xi14 LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT Installed. (Do not complete this section.) Y N NA <br /> This section must be completed If LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ❑ El El Check ail that a ! . Simulated leak rate verified : P4P ❑ 3 GPH 0. 1 GPM El 0. 2 GPH <br /> Was the testing apparatus properly calibrated? El El ❑^ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? El El El <br /> For electronic LLDs , does the turbine automatically shut off when a leak Is detected? ❑ ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a lest? El 1771 El <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? 1:1 11 El <br /> Were ali items on the equipment manufacturer's maintenance checklist completed ? El ❑ El <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ El ❑ <br /> For any answer of "N" above, describe In section XIII how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV , VACUUM I PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Lj Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> I This section must be completed If VPH monitoring is used to perform leak detection monitoring, <br /> i System Type (Mark all that apply. ) Cl Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor FTest Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> I ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail _ <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simuiated leak at far ends of the Interstitial space. <br /> El Visual Inspection <br /> El Other (Describe the method in section XV below.) [I Gauge <br /> Was the vacuum or pressure restored to operating levels In all interstitial spaces? ❑ Yes El No (Describe the reason In section XV below.) <br /> Foran answer of "FAIL" above describe in section XV how and when these issues were or will be corrected. <br /> XV . COMMENTS - <br />: <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH a Vacuum/Pressu "ydrostatic, 10 = idenitflcation <br />