Laserfiche WebLink
Aug . 30 . 2019 8129AM Donlee Pump Co No . 2568 P . 5 <br /> UNDERGROUND STORAGE TANK i <br /> MONITORING SYSTEM CERTIFICATION FORM jPago a of 6) <br /> VIII, MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed 1f a monitoring panel is used to perform look defection moniforfag. Y N NA <br /> Are lhe 'visuai and audible alarms operational? ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks In the cables and for residual buildup to ensure that floats move ffeely, ❑ ❑ <br /> functionally tasted and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned So that other equipmentwill not interfere With their ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ ❑ <br /> j Was the monitoring panel 's backup battery visually inspected, functionally tested, and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is datecled in the under-dispenser canlainmall l? ❑ F1 <br /> Does the turbine automatically shut down if (fie piping secondary containment monitoring system fails to operate or is electrically Q ❑ <br /> disconnected? <br /> Does Iho4urbine automatically shut down if the piping secondary contain nt monitori system detects a leak? ❑ <br /> Which sensors initiate positive shutdown? ' (Check ell that apply.) Q1 Sump 13 Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station, iS 211 communications equipment (e. g. modem) operational? © ❑ <br /> For any an5wor of "N" ahave, desorlb0 It, section IX how and when these doftlencles were or will he correcfed <br /> IX. COMMENTS <br /> X . iNJANK GAUGING TESTING <br /> Check this box if lank gauging is used only for inventory control. (Do not complelo this section.) <br /> ❑ Check this box if NO lank gauging equipment is Installed. (Do not complete this section.) Y N NA <br /> Tills section must be corn loted if in•tank agualho is used to erform leak detection monitorin g. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground ❑ <br /> faults? <br /> Were all in4ank gauging probes visually Inspected for damage and residue buildup to ensure that floats move freely, functionally tested, p ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ p <br /> Was accuracy of system's water loyal readings tested? ❑ Q <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items an the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of "N" above describe In section Xi how and when these deflelencles were or will be corrected, <br /> XL COMMENTS <br />