Laserfiche WebLink
Aug . 30 . 2019 8 . 29AM Donlee Pump Co No . 2568 P . 6 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page'sofs <br /> XII , LINE LEAK DETECTOR TESTING <br /> Check this box if line task detectors (LLD) are NOT Installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ <br /> Check all that a Simulated leak rale verified. i3GPH 0. 1 GPH ❑ 0.2 GPH <br /> Was (lie testing apparatus properly cellbr&ted? ❑ ❑ <br /> For emergency generator tank systems, does the LLD 0(e8t0 an audible and visual alarm when a leak is detected? ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak Is detected? ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑ <br /> For electronic LLDs. does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnecled? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? [ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑ <br /> Were all items on the equipment manufacturar's maintenance checklist completed? ❑ ❑ <br /> Were all LtOs confirmed operational within regulatory' requirements? k ❑ d <br /> Fpr an answer of "N" above, describe In section Xll1 how and when !hese Issuos were or wilt be corrected <br /> XIII . COMMENTS <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This seotlon must be completed if VPH monitoring Is used to perform look detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vocuum CI Pressure ❑ Hydrostatic <br /> Sensor Functionality interstitial Communication <br /> Sensor lD Gomponent(s) Monitored by this Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Mass EI Fail <br /> ❑ Pass Il Fail ❑ Pass d Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass p Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail d Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> El Pass ❑ Fall ❑ Pass ❑ Fall <br /> Q Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass 0 Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Feil <br /> Haw was interstitial communication verified? ❑ $Imulaled leak at Far ends of the interstitial sp&re• ❑ Visual Inspection <br /> ❑ Other (Describe the method In section XV below.) 0 Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? d Yes ❑ No (Describe the reason in section XV below.) <br /> Fur any answer of "FAIL" above, describe in section XV how and when these Issues were or will be corrected, <br /> XV. COMMENTS <br /> (illi <br /> VIRONMENTAL 11 <br /> V _ VA. ►Iu ►1.. %IAL1..1 ......L'..mWt % lbU irtenilRrnNnn <br />