Laserfiche WebLink
Jan , 23 . 2019 7148AM Donlee Pump Co No . 1366 P . 5 <br /> � .w <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Pago 4 of 6) <br /> Y VIII . MONiTORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a tnonitoring pinnal !s used to perlonn leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? El <br /> '•Were all sensors visually inspected (or kinks and breaks in the cables and for residual buildup to ensure [fiat floats move freely, Nr ❑ ❑ <br /> °unctionall tested and confirmed operational? <br /> 'here all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ❑ ❑ <br /> oro aro eration7 Illy <br /> Was monitoring system set-up reviewed to ensure proper settings? <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operalional? 00 ❑ <br /> Does the flow of fuel stop at the dispenser if a leak Is detected in the under-dispenser containment? ❑ <br /> Does lime turbine automatically shut down if the piping secondary containment monitoring system falls to operate or Is electrically ❑ ❑ <br /> disconnected? <br /> I Does the turbine automatically shut down if the piping secondary containmeIM 5 El <br /> onitoring ystem detects a leak? ❑ <br /> Which sensors Initiate positive shut down? (Check ail that apply.) sump Under4spenser containment <br /> it auris are relayed to a remote monitoring station, Is all communications equipment (e .g• modem) operational? ❑ p ❑ <br /> For any answer of "N" above, describe In section IX how and when these deficiencies were or will he corrected, <br /> IX. COMMENTS <br /> AWN11101 600 4 , <br /> X. 1NJANK GAUGING TESTING <br /> IA Check this box if tank gauging is used only for inventory control, (Vo not complete IMS section.) <br /> Cl Check this box if NO lank gauging equipment is installed. (ao not complete thla section.) Y N NA <br /> chis section must be COMA . ietedltimtank au in is ased (o perform leak defection monitoring. <br /> Has ail input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, Including testing for ground Ell ❑ 13 <br /> faults? <br /> Were all in-lank gauging probes visually Inspected for damage and residue buildup to ensure that floats move (reoty, functionally tested , p ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? 0 Q ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ p ❑ <br /> For any answer of 'IN" above describe in section Xi how and when these deficiencies were or will he corrected. <br /> XI . COMMENTS <br /> Hca • <br /> I <br /> V/ <br /> v � V.... KW kf . RIA SAW AnnlirnWe <br />