My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 3:52:48 PM
Creation date
9/3/2020 1:17:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM ( Page 2 of 6) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Joor A Q B x❑ C x❑ I D ❑ <br /> A ❑ I B ❑ 1 C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> px Industry Code or Engineering Standard (Specify) : PEI / RP1 200 - 1 7/Steel Tank/- 6 " Hg . 1 Hour <br /> ❑ Engineered Method (Specify) : <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Tank Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> ICC Service Technician #5246802 - 1.! T 3/20/2021 <br /> Underground Storage Tank Tester License #90- 1120 1 12/31 /2019 <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> Tank A is a 12K , designated for Clear Diesel <br /> Tank B & C is a 10K , Double Compartment Split 6K/4K , 6K designated for Regular 87 and 4K designated Super 91 . <br /> Tank B & C have a Common Tank Secondary Containment . <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith FRP A x❑ IB x❑ CxQ D ❑ <br /> A ❑ I B I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑x Industry Code or Engineering Standard (Specify) : PEI / RP1200 - 17/Fiberglass Pipe/5 Psi 1 hour <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802 - UT 3/20/2021 <br /> Underground Storage Tank Tester License #90 - 1120 12/31 /2019 <br /> Interstitial Communication Verification Method Used : <br /> Release pressure at end of Piping Runs at UDC' s where applicable . <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> i <br /> i <br /> ID = Identification <br /> i <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.