My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 3:52:48 PM
Creation date
9/3/2020 1:17:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM ( Page s of s) <br /> IX . REMOTE FILL PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A 1 B ❑ = C ❑ D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Remote Fill Piping Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> X. COMMENTS <br /> Provide any additional comments here. <br /> NA- Section III -No Remote Fill Piping Containment at this UST Facility , <br /> XI . VENT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer j Identify Tank ID from Section III for each Manufacturer <br /> Smith FRP A ❑X B C ❑x D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> Z Industry Code or Engineering standard (Specify) : PEI / RP1200 - 17/Fiberglass Pipe/5 Psi 1 Hour <br /> ❑ Engineered Method (Specify) : <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Vent Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC UST Service Technician #5246802 - UT 3/20/2021 <br /> Underground Storage Tank Tester License #90 - 1120 12 /31 /2019 <br /> Interstitial Communication Verification Method Used : <br /> NA-Section III -Vent Piping is direct bury at Vent Stack . <br /> XII . COMMENTS <br /> Provide any additional comments here. <br /> ID = Identification <br /> t <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.