My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 1:47:25 PM
Creation date
9/3/2020 1:26:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEURP1200-12 <br /> 6.2.1 Purpose. This method is used to test the 5.if the spill bucket is found to have cracks, loose <br /> integrity of single-walled spill buckets or the pri- pans or separation of the bucket from the fill <br /> maty containment of secondarily contained spill pipe, it is not considered to be liquid-tight.This <br /> buckets. visually indicates a test failure. <br /> 6.2.2 Description of Test. The spill bucket is NOTE- if the fill cap is not included in the <br /> filled %�ith eater.The water level is measured at the spill bucket test and/or the cap is not tight, it <br /> hegmmn.; and end of the test. could be the source of potential fuel contami- <br /> 6.2.3 Test Equipment. Test equipment shall <br /> nation from water intrusion. <br /> include: <br /> NOTE: Before permanently plugging, ensure <br /> • water: that local regulations allmk the drain valve to <br /> • measuring stick that is accurate to within 1/16 )k permanently plugged. <br /> (0.063) inch and of sufficient length: - <br /> • plumber's plug(appropriate size, if used); 6.2.5 Test Procedure. <br /> • stopwatch or other time-measurement devise 1. Add water to the spill bucket to a level within <br /> capable of measuring a I-second increment 1.5 inches of the top of the spill bucket. Allow <br /> the water to settle for 5 minutes before the initial <br /> 6.2.4 Preparation. water level measurement is taken. <br /> 1.Care should be taken when conducting the test 2. Place the measuring stick vertically at the lowest <br /> in the rain or during freezing weather condi- point in the spill bucket and extending above the <br /> tions. water level to allow for an accurate measure- <br /> 2. Remove and properly dispose of any liquid and ment to be taken. The location of the measuring <br /> debris (leaves, sediment and trash) in the spill stick must remain the same for each water level <br /> bucket.Clean the spill bucket and examine it for measurement, Document the initial water level <br /> damage, defects or improperly installed compo- measurement as measured from the bottom of 1-01 <br /> nents. if there are loose components(e.g., loose the spill bucket.Alternative measurement meth- <br /> band clamps or bolts),tighten these items before ods may be used provided that measurement to <br /> conducting the integrity test. If there are items 1/16(0.063)inch can be made. <br /> that must be repaired or replaced (e.g.. deterio- 3.'Take all precautions to prevent the water level <br /> rated gaskets/seals or drain valves), notify the from being disturbed during the duration of the <br /> owner/operator. test. <br /> 3.Examine the fill cap and adapter fitting for 4.After l hour, document the ending water level <br /> loose, missing or damaged parts, and make measurement. <br /> necessary repairs. Complete any repairs before S. Upon completion of the test, remove and dis- <br /> putting water in the spill bucket. Make sure that pose of the water according to Section 63, and <br /> the seal on the fill cap is present and in good dry the inside of the spill bucket before returning <br /> condition.'The cap must fit securely and be leak- it to service. <br /> Light on the riser.The water level during the test <br /> typically will be above the cap, so a leaking cap 6,2,6 Pass/Fail Criteria. If the water level has <br /> will result in a failed test. As an alternative to a dropped less than I/8 (0.125)inch, the spill bucket <br /> tight fill cap,use a plumber's plug in the fill riser passes the integrity test. <br /> if approved by the authority having jurisdiction <br /> (AHJ)and tank owner. If the water level has dropped 1/8 (0.125) inch or <br /> 4.The spill-bucket drain valve, if present, must greater, the spill bucket fails the integrity test. <br /> be leak-tight to pass the test. If it is not leak- 6.3 Spill Bucket Integrity Testing — Vacuum Test <br /> tight, it may be possible to simply remove and method. <br /> permanently plug the drain valve, However, if <br /> you choose to permanently plug,ensure that the 6.3.1 Purpose. This method is used to test the <br /> local regulations allow this modification. integrity of single-walled spill buckets or the pri- <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.