My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 1:47:25 PM
Creation date
9/3/2020 1:26:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,leak Detection and Secondary Containment F( .iipment at UST Fadlities <br /> mary containment of secondarily contained spill <br /> buckets. WARNING: Use only an air operated vacu- <br /> um source or a vacuum pump powered by <br /> 6.3.2 Description of Test. Using a specially an explosion-proof motor. Vacuum pumps <br /> equipped test cover,a partial vacuum is applied to with electric motors that are not explo- <br /> the spill bucket-The vacuum level is monitored for sion-proof may ignite flammable vapors. <br /> a 1-minute period. If a portable air compressor is used, it <br /> should be located at least 20 feet away <br /> 6.3.3 Test Equipment. Test equipment shall from the venturi-eductor or outside any <br /> include: Class I, Division 1 area. <br /> • Vacuum test apparatus (The test apparatus may <br /> be available from the spill bucket manufacturer. <br /> 6.3.4 Preparation. <br /> It includes an air pressure regulator, a vacuum <br /> source, a vacuum gauge with a minimum 0-50 1. Remove and properly dispose of any liquid and <br /> inch water column range and a control valve.The debris (leaves, sediment and trash) in the spill <br /> control valve is used to adjust the vacuum level.); bucket.Clean the spill bucket and examine it for <br /> • Test cover (The cover is equipped with a test damage•defects or improperly installed compo- <br /> fitting.); nents. If them are loose components(e.g., loose <br /> band clamps or bolts),tighten these items before <br /> • Plumber's plug (appropriate size, if used); performing the integrity test. If there are items <br /> • Stopwatch or other time-measurement device that must be repaired or replaced (e.g., deterio- <br /> capable of measuring a I-second increment: rated gaskets/seals or drain valves), notify the <br /> owner/operator to obtain approval before pro- <br /> • Gasketing material (The purpose of the gas- ceeding with the needed repairs. <br /> keting material is to provide an air-tight seal 2,Examine the fill cap and adapter fitting for <br /> between the test cover and the spill bucket.). <br /> loose,missing or damaged parts and make nec- <br /> essary repairs.Make sure that the seal on the fill <br /> o-50•water column cap is present and in good condition. The cap <br /> Vacuum vacuum Gauge must fit securely and be leak-tight on the riser. <br /> Source ... i A leaking cap will result in a failed test. As an <br /> alternative to a tight fill cap, use a plumber's <br /> plug in the fill riser. <br /> Control <br /> Valve 3.The spill bucket drain valve, if present, must be <br /> leak-tight to pass the test. If the drain valve is <br /> not leak-tight, it may be removed and perma- <br /> nently plugged. <br /> NOTE: Before permanently plugging, ensure <br /> Plumber's Plug in that local regulations allow the drain valve to <br /> Tank Riser Pipe be permanently plugged. <br /> 4.Clean any contamination from the top surface <br /> of the spill bucket where the cover makes a seal <br /> and line it with Basketing material. <br /> S.Place the test cover on the spill bucket,con- <br /> firming that it makes a tight seal with the Bas- <br /> keting material. <br /> FIGURE 6-2. The cover must make a tight seal with the 6.Connect the line from the vacuum source to the <br /> spill bucket to prevent leakage when the vacuum is adapter on the cover. <br /> � pulled during the test <br /> 7. If the spill bucket is found to have cracks, loose <br /> parts or separation of the bucket from the fill <br />
The URL can be used to link to this page
Your browser does not support the video tag.