My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 1:47:25 PM
Creation date
9/3/2020 1:26:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEURP1200-12 <br /> pipe, it is not considered to be liquid-tight. This and secondary containment. The vacuum level is <br /> visually indicates a test failure. monitored for a 1-minute period. <br /> 6.3.5 Test Procedure. 6.4.3 Test Equipment. lest equipment shall —.01 <br /> L Slo%;,ly apps} a Vacuum of 30 inches water include: <br /> column to the spill bucket and close the valve. vacuum test apparatus (The test apparatus may <br /> If a 30-inch water column vacuum cannot be be available from the spill-bucket manufacturer. <br /> attained, the spill bucket fails the test. See It includes an air pressure regulator, a vacuum <br /> Appendix B for pressure and vacuum conver- source, a vacuum gauge with a minimum 0-30 <br /> sions. inch water column range, a test fitting and a <br /> 2.Start the time-measurement device and record control valve.The control valve is used to adjust <br /> the initial vacuum level shown on the gauge. <br /> the vacuum level.); <br /> 3. After I minute,record the ending vacuum level. stopwatch or other time-measurement device <br /> capable of measuring a I-second increment. <br /> Upon completion of the test, release the vacuum, <br /> remove the test apparatus and the gasketing mate- WARNING: Use only an air-operated vacu- <br /> rial from the spill bucket and replace the original um source or a vacuumum <br /> p p powered by <br /> cover. an explosion-proof motor. Vacuum pumps <br /> with electric motors that are not explo- <br /> sion-proof may ignite flammable vapors. <br /> If a portable air compressor is used, it <br /> should be located at least 20 feet away <br /> from the venturi-eductor or outside any <br /> Class I, Division 1 area. <br /> k come:Valve <br /> � Y <br /> 0-30^wafer Coiumr <br /> Vacuum Gauge <br /> i <br /> FIGURE 6.3. The vacuum test method can detect a spill <br /> bucket leak by measuring the change in vacuum level <br /> during the test. <br /> 6.3.6 Pass, Fail Criteria. If the ending vacuum <br /> level is 26 inc.hc-, �%rater column or greater,the spill -- <br /> bucket passes the test. <br /> If the ending vacuum level is less than 26 inches <br /> water column, the spill bucket fails the test. <br /> 6.4 Double-Walled Spill Bucket Integrity Testing — FIGURE C-4. Check lines and connections to ensure <br /> Vacuum Test Method. that they are leak-tight before starting the test. <br /> 6.4.1 Purpose. This method is used to test the <br /> Integrity of the primary and secondary containment 6.4.4 Preparation. <br /> of the double-walled spill bucket. <br /> 1. Remove and properly dispose of any liquid and <br /> 6.4.2 Description of Test. A partial vacuum is debris (leave.~, sediment and trash) in the spill <br /> applied to the interstitial space between the primary bucket. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.