Laserfiche WebLink
• An important characteristic of good backfill material is hardness 1.2.4.2.Geotextile helps preserve the integrity of the select backfill <br /> or stability when exposed to water or loads.Most materials have envelope that surrounds and supports the tank. <br /> no problem meeting the hardness requirement. • Geotextile fabric allows the passage of water in and out of the excavation <br /> • Materials like soft limestone,sandstone,sea shells or shale should but prevents the migration and mixing of in-situ soil and the select <br /> not be used as backfill because they may break down overtime. backfill material. <br /> • When using select rounded stones,they must conform • Polyethylene film is not considered an effective geotextile material <br /> to the specifications of ASTM C 33,size numbers 6,67 because it may tear or degrade while in service. <br /> or 7.See Primary Backfill Requirements(Appendix C) • If geotextile is used,install geotextile before placing bedding material. <br /> for additional information on backfill material specifications. • The tank owner or the owner's technical representative is responsible <br /> • When using select crushed stones,they must conform to the for determining whether a geotextile or an alternate filtering <br /> specifications of ASTM C 33,size numbers 7 or 8.See Primary technique is appropriate for a specific installation. <br /> Backfill Requirements(Appendix C)for additional information 1.2.4.3.Where both primary and secondary backfill are used, <br /> on backfill material specifications. a layer of geotextile filter fabric must be installed overthe entire <br /> 1.2.2.2.We recommend that the supplier of backfill material provide surface of primary backfill material before secondary backfill <br /> the tank installer and tank ownerwith written certification is placed.Note the following instructions: <br /> that the material conforms to ASTM C 33,ASTM D 448,AASHTO M 43, • All joints in the filter fabric must be overlapped a minimum <br /> and any other applicable specifications. of 12 inches[30 cm]. <br /> 1.2.2.3.If primary backfill material which meets these specifications • Geotextile fabric must overlap onto the tank and excavation surface <br /> is not available,contact technical support(ena.su000rt@zcl.com)for a minimum of 12 inches[30 ml]. <br /> �� <br /> information on alternate materials,installation instructions for alternate • See Split Backfill Instructions(Appendix D)for more information <br /> regarding this installation situation. <br /> materials and the process for approval. <br /> 1.2.3.SECONDARY BACKFILL 1.3. EXCAVATION REQUIREMENTS <br /> 1.2.3.1.When used(see Appendix D),secondary backfill material A WARNING <br /> must meet the following specifications: Consult OSHA's regulations,and/or applicable Canadian federal, <br /> • Material is to be clean,free-flowing,and free of large rocks, provincial and municipal safety codes and operational regulations, <br /> roots,organic materials,debris,ice and snow. whichever are relevant.Collapse of excavation walls could result <br /> • Backfill material shall not be frozen or contain lumps of frozen in death or serious injury. <br /> material at any time during placement and compaction. 1.3.1.GENERAL <br /> • Material must be compacted to achieve a minimum of 85 percent 1.3.1.1.The installing contractor must take all necessary precautions <br /> standard proctor density. in or near a tank excavation.These precautions should include but are <br /> • 100%of all backfill material must pass through a 1-inch[25-mm]sieve. not limited to the following: <br /> 1.2.3.2.Material must be installed in 12-inch to 24-inch[30-cm • Locate and protect any utility installations near the excavation before <br /> to 61-cm]lifts compatible with the compaction equipment used. opening the excavation. <br /> 1.2.3.3.In some conditions,frost heave may be encountered when • Secure the walls of the excavation. <br /> using secondary backfill.Therefore,consider any frost-related problems • Take appropriate precautions to protect against exposure to hazardous <br /> that may occur. vapors from the excavation. <br /> • Avoid hazards associated with water accumulation in the excavation. <br /> 1.2.3.4.Specifications for secondary backfill material and compaction • Erect barricades,etc.,to prevent unauthorized vehicle or pedestrian traffic. <br /> above the filter-fabric layer may be determined by the requirements of the • Inspect,a minimum of once a day,the excavation and surrounding <br /> piping,surface slab or roadway. area during the entire installation process. <br /> 1.2.3.5.Refer to applicable codes or standards for base course 1.3.1.2.Foradditional information on excavation,trenching and shoring <br /> and sub-base course material and compaction requirements. safety practices,consult OSHA's regulations,and/or applicable Canadian <br /> 1.2.3.6.The following are examples of acceptable secondary backfill material: federal,provincial and municipal safety codes and operational regulations, <br /> • clean native backfill whichever are relevant. <br /> • coarse sand A WARNING <br /> • gravel Follow OSHA regulations or consult your local Canadian regulations <br /> 1.2.4.GEOTEXTILE concerning tank excavations,whichever are relevant.Collapse of <br /> excavation walls could result in death or serious injury. <br /> 1.2.4.1.Using geotextile fabric is considered good installation practice 1.3.1.3.The minimum clearance dimensions given in this section <br /> and using it in any installation is recommended,especially when the tank are important to the successful installation of a tank. <br /> is installed in the following conditions: <br /> • areas with frequently changing groundwater conditions or areas 1.3.1.4.Additional clearances may be necessary due to regulations, <br /> subject to tidal fluctuations safety requirements or operational requirements of governmental <br /> • unstable soils such as those cited in section 1.3.5.3 agencies.Follow all applicable regulations and safety practices. <br /> • water conditions with silty in-situ soil <br /> 05 <br />