My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24.Actual capacities shown will be reduced if an overfill-protection 1: PLANNING <br /> device is installed in the tank. FOR INSTALLATION <br /> 2S.Actual tank height may be greaterthan that shown with actual <br /> tank diameter when certain accessories are installed on a tank. I.I.GENERAL <br /> 26.Load height during shipping may vary due to tank placement I.I.I.This section of the Installation Manual contains information that <br /> on the shipping trailer. you need to consider before a tank is delivered so that you are prepared <br /> 27.When using Appendices B1,62,63 and B4 for determining to proceed with installation.This includes,but is not limited to,equipment <br /> the weight of a multicompartment tank,you must select the tank needed for installation,backfill material selection,excavation requirements, <br /> size in the chart given the total nominal capacity of all compartments. tank anchoring options,taking diameter measurements,and onsite <br /> Note the following: testing requirements. <br /> • Single-wall(SW)tanks with flat baffle(s)installed are not 1.1.2.The following list is to be used as a guide for equipment <br /> considered multicompartment tanks.Refer to one-compartment recommended for tank installation: <br /> tank data for these tanks. • excavation equipment capable of producing a level-bottom <br /> • For double-wall(DW)tanks with a dry interstice,use the DW Dry hole and placing backfill material at any point in the excavation <br /> Weight column. • suitable lifting equipment capable of lifting and placing <br /> • For double-wall(DW)tanks with a factory-installed TRUCHEK' the tanks and associated tank anchors <br /> wet monitoring interstice,use the DW Wet Weight column. . spirit level <br /> • transit or grade level <br /> SUPPLEMENTAL MATERIALS • 50-foot[15-meter]tape measure <br /> • tamping rod(s) <br /> 28.Go to zcl.com to view tank installation training videos. • pipe wrenches and appropriate pipe joint compound <br /> • a test manifold for each pressure-testable tank or <br /> 29.Supplemental materials,which may apply to specific installations compartment(reference Figure 4.1) <br /> and/or conditions,are available upon request from technical support . source of pressurized air capable of 6 psig[40 kPa]or inert gas <br /> (ena.support@zcl.com).Most supplemental materials are also available . soap and water solution(during freezing conditions, <br /> at zcl.com. a suitable solution such as windshield wiper fluid may <br /> 30.Among those materials available from technical support be added to the soap and water mixture) <br /> (ena.su000rt@zcl.com)and at zcl.com are the following: • soft cloth,brush or hand-held pneumatic sprayer <br /> • Diesel Exhaust Fluid(DEF)Tank Installation Instructions • hand shovel <br /> • Double-Wall Containment Sump Installation Instructions • lifting sling(s) <br /> • Dry Interstitial Space Test • soil compacting equipment(if necessary) <br /> • Field Fiberglass Lay-Up Instructions for Containment Sumps 1.2. BACKFILL MATERIAL AND GEOTEXTILE <br /> • Flexible Dipstick Monitoring Instructions(Canada only) <br /> • Hook/Hook Anchor Straps Instructions(Canada only) 1.2.1.GENERAL <br /> • Large Bottom Sump Installation Instructions 1.2.1.1.Tanks shall be installed using select rounded stones orcrushed <br /> • Oil/Water Separator Operating and Maintenance Manual stones as primary backfill material.See section 1.2.2 for specifications <br /> • Preinstallation Testing Instructions for Water/Wastewater of primary backfill material and Appendix C. <br /> Tanks Factory-Equipped for Pressure Testing <br /> • TRUCHEK'Data Log and Testing Procedure 1.2.1.2.Alternatively,tanks shall be installed using primary backfill <br /> • Single-Wall Containment Sump Installation Instructions vertically up to at least 75 percent of the tank diameter and secondary <br /> for Flat-Sided Containment Sumps backfill above the primary backfill.See section 1.2.3 for specifications <br /> • Single-Wall Containment Sump Installation Instructions of secondary backfill and Split Backfill Instructions(Appendix D) <br /> for Round Containment Sumps for more information regarding this alternative. <br /> • Triple-Wall Tank Preinstallation Testing Instructions(US only) 1.2.1.3.Using backfill material otherthan that specified here without <br /> • Watertight Cover Gasket Replacement Instructions(US only) prior written authorization from us will void our obligations underthe <br /> applicable limited warranty. <br /> LIMITED WARRANTIES NOTICE <br /> Using other than specified backfill material could cause tank failure, <br /> 31.Our applicable limited warranty contains operating guidelines or could result in damage to the tank and/or surrounding property. <br /> and limitations that should be reviewed as applicable.Copies of our <br /> current limited warranties are found at zcl.com. 1.2.2. PRIMARY BACKFILL <br /> 1.2.2.1.Primary backfill material must meet the following specifications: <br /> • Material is to be clean,free-flowing,and free of dirt,sand,large rocks, <br /> roots,organic materials,debris,ice and snow. <br /> • Backfill material shall not be frozen or contain lumps of frozen <br /> material at any time during placement and compaction. <br /> 04 I-T'(;ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.