My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3.5.During pressure tests,ambient air temperature can affect 4.5.2.If the tank is not configured as shown in Figure 4-2 prior <br /> pressure-gauge readings. to installation,contactthe manufacturing facility thatshipped the tank. <br /> 4.3.6.When testing tanks with wet monitoring,remove Figure 4-2 <br /> the reservoir fitting plug. <br /> -------------- <br /> 4.3.7.If the tank has threaded fittings,the installer is Interstitial ' <br /> responsible for selecting a thread sealant that is compatible Test Manifold , Nylon Tie <br /> with the product being stored.Some sealants cannot be used <br /> with some stored products. --------+------- <br /> 4.3.8. <br /> -4.3.8.Remove factory-supplied temporary plugs and ----------------- <br /> install p <br /> -- -installp ermanentplu s in all openings where piping will <br /> _-------,-' Quick Disconnect <br /> not be installed. ------ Assembly <br /> 4.3.9.Make sure all manway bolts or flange bolts are <br /> torqued to 25 ft-Ib[34 N-m],and fitting plugs are properly --- <br /> doped and sealed. <br /> 4.3.10.The tank may be pressure tested with the Monitor Monitor <br /> factory-supplied temporary plugs.Redope and tighten Access Fitting Access Fitting <br /> temporary plugs if needed. <br /> 4.3.11.Keep one service fitting open in each compartment <br /> forthe test manifold. <br /> 4.3.12.Tanks equipped with flanged nozzles may <br /> require contractor-supplied blind flanges for preinstallation ALTERNATE STANDARD <br /> pressure testing. METHOD METHOD <br /> 4.4.PRESSURIZING THE PRIMARY TANK <br /> 4.5.3.The quick-disconnect assembly must not be connected to the <br /> 4.4.1.Install the test manifold in the open service fitting service fitting when pressure testing the primary tank.Keep the nylon <br /> and connectthe pressure source to the test manifold. tie in place. <br /> 4.4.2.If the interstitial space is dry,close the valve 4.5.4.Maintain the pressure in the primary tank. <br /> on the interstitial test manifold before pressurizing the <br /> primary tank. NOTICE <br /> Do not connect the pressure supply directly to the access fitting for <br /> 4.4.3.Open the pressure-supply valve and pressurize the primary interstitial-space monitoring.Pressurizing the secondary tank(in- <br /> tank to 5 psig[35 kPa](3 psig[21 kPa]for 12-foot-diameter tanks). terstitial space)by itself could damage the primary tank or cause <br /> Allow a few minutes for the temperature in the tank to stabilize, tank failure. <br /> then allow the pressure to stabilize by adding or removing pressure <br /> as necessary. 4.5.5. Free the hose from the service fitting by cutting the nylon tie. <br /> 4.4.4.Close the valve on the primary tank test manifold 4.5.6.Insert the hose into the quick-disconnect fitting and open the valve <br /> and disconnect the pressure supply. to allow pressure to transfer from the primary tank to the interstitial space. <br /> 4.4.5.Hold and monitor the pressure for a minimum of 1 hour. 4.5.7.Reconnect the pressure-supply line.Allow the pressure <br /> to stabilize at 5 prig[35 kPa](3 psig[21 kPa]for 12-foot-diameter <br /> 4.4.6.If the interstitial test manifold shows a pressure build-up tanks)by adding or removing pressure as necessary. <br /> in the interstitial space of a dry-monitor,double-wall tank,contactthe <br /> manufacturing facility that shipped the tank. 4.5.8.Close the pressure-supply valve on the test manifold <br /> NOTE:Do not attempt unauthorized repairs. and disconnect the pressure-supply line. <br /> 4.6.SOAPING THE TANK <br /> 4.5.PRESSURIZING THE INTERSTITIAL SPACE <br /> IN A DRY TANK 4.6.1.After pressurizing the tank,soap the tank to check the tank's <br /> i nteg rity. <br /> A WARNING • Soap either the fittings,manways and covers or the entire exterior of the <br /> Never lift or hoist a tank under pressure.Failure to follow tank,depending on what part of the testing process the tester is at and <br /> this warning could result in death or serious injury. what kind of tank is being pressure tested.See Pressure Testing Sidebar <br /> NOTE:Do not attempt unauthorized repairs. instructions for specific types of tanks. <br /> • Watch for active bubbles.There should not be any. <br /> 4.5.1.Tanks with a dry interstitial space come with a quick-disconnect • During freezing conditions,a suitable solution such as windshield <br /> assembly that may be used as the interstitial test manifold.See Figure 4-2. washer fluid may be added to the soap and water mixture. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.