My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6.2.When doing a soap test,rotate the tank to check the bottom. 4.8. RELEASING PRESSURE FROM THE TANK <br /> Do not rotate a tank filled with monitoring fluid. 4.8.1. If there is an interstitial space to pressurize,open the valve <br /> NOTE: Before rotating the tank,place protective material of the interstitial test manifold and carefully release the pressure <br /> on the area on which the tank will be rotated.Make sure the in the interstitial space first. <br /> area is flat and free of large or sharp objects,such as rocks, 4.8.2.If the tank is a multicompartment tank,carefully release the <br /> which may damage the tank. pressure in the end compartments first. <br /> 4.6.3.Rotate the tank slowly and carefully to avoid developing 4.8.3.Then carefully release the pressure from the base tank. <br /> too much momentum.Momentum can grow because manways <br /> and fittings on top of the tank make it top heavy. NOTICE <br /> NOTE:Make sure the tank's fittings and manways never touch Never allow the pressure in the interstitial space to be greater than <br /> the ground.Do not rotate the tank more than 120 degrees from the pressure in a primary tank.Failure to follow this notice could <br /> the initial starting point. result in damage to a primary tank and/or tank failure. <br /> 4.6.4.If damage is detected,contact the manufacturing facility that A WARNING <br /> shipped the tank. Never remove the service-fitting plugs when there is pressure <br /> in the tank.Failure to follow this warning could result in death <br /> NOTE: Do not attempt unauthorized repairs. or serious injury. <br /> 4.7. PERFORMING VISUAL CHECKS ON 4.8.4.Remove the test manifolds and replace the protective covers <br /> ATAN K WITH A WET INTERSTITIAL SPACE in the service fittings. <br /> NOTICE 4.9.TESTING FOR SPECIFIC TYPES <br /> Never pressurize a wet interstitial space.Doing so could result in OF PRESSURE-TESTABLE TANKS <br /> damage to the tank and/or tank failure. <br /> NOTE: When pressure testing a tank,follow the procedures <br /> NOTICE outlined in Pressure-Testing Sidebar for the specific type of tank <br /> Never rotate a tank filled with monitoring fluid.Doing so could being installed. <br /> result in damage to the tank and/or tank failure. 4.9.1.GENERAL <br /> 4.7.1.Check that the tank has monitoring fluid in the reservoir. 4.9.1.1.Prepare the tank for pressure testing in the following way: <br /> Measure the level of the monitoring fluid in the reservoir and record <br /> on checklist. • assemble items needed for testing,including compressor, <br /> soap/water solution,brush,sprayer,test manifold and pressure lines <br /> NOTE: If the reservoir is less than 1/3 full,contact the manu- • set the tank in an area where the tank can be safely manipulated <br /> facturing facility that shipped the tank.See the back cover of the and observed without risking property damage or injury <br /> Installation Manual for contact numbers. • install the test manifold(s) <br /> 4.7.2.Visually check both the interior and the exterior of the tank • clean service fittings and plugs,and apply pipe thread sealant <br /> for monitoring fluid.(The monitoring fluid is dyed blue to distinguish • install gaskets,blinds and flange bolting <br /> between moisture and monitoring fluid.)There should not be any. • seal service fittings,nozzles and other openings <br /> • Visually check the interior of the tank. • clean surfaces as required <br /> o check each compartment of a multicompartment tank 4.9.2. PRESSURE TESTING A SINGLE-WALL TANK <br /> • Visually check the exterior of the tank. <br /> check the exterior of each compartment of a multicompartment tank 4.9.2.1. See Pressure Testing Sidebar for instructions. <br /> if monitoring fluid is found,wipe the tank dry and verify that the 4.9.3.TESTING A WET DOUBLE-WALL TANK <br /> monitoring fluid does not reappear <br /> lift the tankto check the bottom—do not roll the tank NOTICE <br /> Never pressurize a wet interstitial space.Doing so could <br /> NOTE:Tanks are shipped with a pop-off valve to ensure that excess result in damage to the primary tank and/or tank failure. <br /> pressure does not build in the interstitial space during shipping and/or <br /> storage.Conditions such as excess heat can cause this valve to release. 4.9.3.1. See Pressure-Testing Sidebar for instructions. <br /> If the tank is rotated and the ambient temperature is much higher than 4.9.4.TESTING A DRY-MONITOR, <br /> when it was shipped,the pop-off valve will relieve the pressure,which DOUBLE-WALL TAN KWITH THE <br /> may result in monitoring f luid on the tan k surface.If this occurs,wipe INTERSTITIAL SPACE UNDER VACUUM <br /> the tank dry and verify that the monitoring fluid does not reappear. <br /> NOTE: Adry-monitor,double-wall tank may be shipped from <br /> NOTE: If there is still monitoring fluid present on the tank after the factory with the interstitial space under vacuum.This option <br /> completing this process,contact the manufacturing facility that allows for monitoring the tank during shipping and handling, <br /> shipped the tank. and may expedite tank installation by shortening preinstallation <br /> testing procedures.The date that the vacuum was applied is <br /> on a label near the monitor or on the shipping documentation <br /> delivered with the tank. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.