My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 5:31:32 PM
Creation date
9/8/2020 11:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specifications <br /> • Model: 708-590 Series <br /> • Type: Class I Automatic Overfill Shutoff Device—Gravity Fill Only <br /> • Size: Fits through 4" schedule 40 (DN 100) pipe <br /> • Flow rate: 25-370 GPM (95-1400 LPM) <br /> • Static pressure rating: 10 PSI (0.7 bar) MAX <br /> • Compatibility: Liquid petroleum fuel blends (EO-E85, 130-1320) <br /> Valve operation <br /> The Franklin Fueling Systems (FFS) model 708-590 Series Overfill Prevention Valve (OPV) is <br /> designed with a primary shutoff that activates between 85 and 92% of tank volume, depending <br /> on the tank diameter. When the primary shut-off is actuated, the flow through the OPV is limited <br /> to less than 8 GPM (30 LPM). A secondary, positive shutoff happens at 95%tank volume if you <br /> continue filling.After primary shutoff, you can still drain the delivery hose, but you must be <br /> extremely careful and follow these steps: <br /> 1. Close the truck bottom loading valve. <br /> 2. Wait 5 minutes <br /> 3. Partially open the coupler between the delivery hose and the bottom loading valve and <br /> allow the hose to drain. <br /> NOTE: Shutoff points are affected by the specific gravity of the stored liquids.These instructions <br /> are based on the average performance of all products.The OPV was designed to be only an <br /> emergency overfill prevention device. <br /> NOTE: Determine if the underground storage tank has a ball float vent valve. If it does, make sure <br /> the nipple portion does not extend more than 3" (76.2 mm) into the tank. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.