My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P, PM Design Group,Inc. <br /> 6930 Destiny Drive,Suite 100 <br /> DESIGN Rocklin,CA 95677 <br /> Architectural <br /> Solutions Group <br /> November 28, 2018 <br /> RE: 141 E. HARNEY LN. n ll`I 2Q1 <br /> Lodi, CA 95240 <br /> DNP17002.2 <br /> Dear Elena Manzo: <br /> 1) Please provide installer/contractor information (on your application form) and submit <br /> all relevant installer/tester certifications <br /> Response: Contractor information provided on application. Contractor certifications included in <br /> submittal. Contractor will provide workers comp number and documentation when picking up <br /> permit. i <br /> 2) Provide fire permit number (on your permit application form) (-e <br /> Response: Number added to application <br /> 3) Provide a copy of your ELD workplan _ d(i K Q- —� CLU ICS 10 t Q 06- <br /> Response: Provided in submittal <br /> 4) Provide cut sheets for all proposed parts on your pats list,for example tank cut sheets <br /> are still needed- tank installation instructions were provided in lieu of the tank cut sheets <br /> - 5tiu ,A-Cktd , <br /> Response: All cu sheets have been updated and provided in submittal <br /> 5) Clarify whic ak detector will be used and provide its cut sheet. FE Petro cut sheet was <br /> not provided dnd FE Petro was listed on the application, howerver, Veeder Root PLLD <br /> was ld your` he parts list <br /> Response: To clarify, Vee' root was/shown on the SJCEHD Application for UST Installation <br /> Permit and Fe Petro was sho on4he Equipment Schedule. The cut sheet also referenced Fe <br /> Petro. Please refer to the SJC UD Application for UST Installation Permit where I have revised <br /> it to show the Fe Petro STP- as the correct leak detector to be consistent with the <br /> Equipment Schedule and t Fe etro cut sheet where it is referenced as Item # Y01. <br /> 6) Ap is ton lists 42"sumps, however parts list lists 42" and 48"sumps,please clarify <br /> Response: th, 42" and 48" sumps are being used. 48" sump has been added to section"J"of <br /> the applic do . <br /> Columbus Dallas Denver East Bay Arca Houston <br /> Los Angeles Phoenix PortlandNancouver Sacramento San Francisco <br />
The URL can be used to link to this page
Your browser does not support the video tag.