Laserfiche WebLink
t . <br /> 7) Please clarify if chase lines will be instal d between fill and STP sumps and if these lines <br /> will be VPH monitored,please provide rev' ed sheets t emonstrate this. For example <br /> G.0.1 shows chase pipe on 87 UST but G.1. does ' show that pipe. Also the general <br /> pipe layout is different between these sheets on G.1.0, vent pipe to 12K tank ends <br /> abruptly before the sump. <br /> Response: Chase lines will be installed be een fill and TP sumps and they will be VPH <br /> monitored. Please refer to sheets GO.1 a G 1.0 where the -iping diagrams have been revised to <br /> correct the error and inconsistency. <br /> 8) G.0.1 table lists sIvalas "#value!"please clarifyResponse: Table was rearity. <br /> 9) Ensure that all liquid sens rs are stalled at the lowest points,for example on G.4.0 the <br /> 208 sensor is not shown at e l est point. On G.6.0 (vent sump detail), no Veeder Root <br /> 208 sump sensor bottom is le due to the proposed sensor sleeve set up. <br /> Response: Key note#3 has bee ad ed to sheets G4.0, G4.1, G6.0 and keynote #5 added to <br /> sheet G5.0 indicating that the nsor is o be installed at the lowest poin e sump and that <br /> nothing is to obstruct its vie ,,.�..w• ��""""" <br /> 10)Please clarify how VPH piping communication will be tested, no apparent ports of-valves <br /> or provisions to test communication on a routine basis were observed. Also on G.5.0, <br /> "end view" a hose is exiting the secondary containment penetration and terminates <br /> without leading anywhere,please correct and resubmit. No communication test port is <br /> visible on G.6.0 vent sump drawing,please clarify if communication test port will be <br /> installed on the vent piping termination inside the vent sump. Vacuum and brine <br /> monitoring provisions must be illustrated on UDC, vent and tank sump cross-sections <br /> Response: The tubing has been deleted from the details on sheet G5.0. Sheet G12.1 has been <br /> ' added to the plan set and details the vacuum monitoring system. For clarity vacuum monitoring <br /> system details are not shown on sheets G4.0, G4.1, G5.0, and G6.0 and those sheets have notes <br /> + referencing the reader to sheet G12.1 for vacuum monitoring system details. Detail 2 on sheet <br /> G12.1 shows the vacuum sensor verification manifold, which is to be installed at the furthest end <br /> of the secondary piping (product and vent) for communication test of the vacuum. <br /> 11)Bravo sumds are listed o e parst, kowever,"page gof 8 of the permit application <br /> lists D lex Works,please clarify. <br /> Response: App OX <br /> tion has been changed to Bravo. <br /> 12)Please clarify if Veeder Root 350 or 350 Plus will be used, it appears to be used <br /> intermittently on the plans. <br /> Response: Per item# Z13 on sheet G7.1, a Veeder Root TLS-350 Plus will be installed. <br />