My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN 10 RQ U I N Environmental Health Department <br /> C0UN I Y <br /> Service Request Daily Time and Activity Summary from 3/24/2013 to <br /> 3/24/2050 for SR0079417 located at <br /> C-STORE W/76 FUEL ISLAND <br /> Activity Date Recorded by <br /> were included in this revised submittal. G6.2 lists 3 vacuum zones, however, 9 <br /> smart sensors are shown on G12.1, please clarify. <br /> 13) Provide the following certifications: INCON for Byron Molina, a current Xerxes <br /> certification for all tank installers (the submitted certification has a typed in <br /> expiration date), certifications for all proposed flex connectors (Unisource, Fireflex <br /> and Flexing), Phil-Tite, Franklin Fueling Defender Series, and Fe Petro for leak <br /> detectors. <br /> 14) Provide all computability documentation and UL/third party listing information <br /> (see attached compatibility requirement guidance letter dated January 2019 for <br /> more information) <br /> 02/01/2019 A conference call with Mel Higginbotham: (916) 303-2814, Omar Nasim: (916) PE 2303 MANZO <br /> 42 min 807-4076. They received the deficiency letter, clarified submittal expectations, the SC 031 <br /> format and the potential approval turn around. Mel indicated that they should be <br /> submitting a revision by February 7th. Muni indicated that we can't promise <br /> anything, but if nothing else is outstanding we can review it in about one week. I <br /> clarified my concerns about buoyancy calculations and cut sheets. Mel indicated <br /> that a general contractor and sub contractor are involved in this project, I <br /> requested to have both identified. Muni discussed his concerns with the current <br /> UST contractor and that if any inspection delays or multiple site visits are required <br /> EHD will be billing for all visits. Mel indicated that they understood. <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.