Laserfiche WebLink
FROM CEO—PHASE EHU I R`""ENTAL INC Pf JNE NO. : 209 9?Q7, P02 <br /> -- GEOTHASE <br /> ENVI.ROI` WNTAL <br /> March 2, 1998 <br /> Proposal Nu_: 171.1 <br /> Project Nainp: Bloom, (Turnpike) <br /> Mr. Don Bloom <br /> clo,Jim Martin <br /> Lee & Associates <br /> 241 14'rank Wast. Circle, Suite 300 <br /> Stockton, CA 9N2()6 <br /> Re: Work Plan: Phase II Etsvironmental Site Assessment <br /> Location: 2554 & $ Turnpike Road,Stockton, CA <br /> Dear Mr. Martin: <br /> Gen-Pbase is pleaiscd to provide you with the fcllowieig work plan for the <br /> completion of enviroriniontal ass3esoment work, tit the above Proptrty. The work <br /> is intended to obtain soil and groundwater esunpicy frain the capillary fringe to <br /> determine if diesel from a nearby off-site: underground fuel storage tank has <br /> migrated through the grotuldwater to impact the suhjeet site. The work woL71d <br /> include the following: <br /> 1. Obtain the required San Joaquin County Publiv health Services <br /> F.-nvirunmental Health Division (&JC-PHS-EHD) Permit to install the Roil <br /> boring. Notify Underground SrrViec alert and SJC-1'HS 48 hours privy to <br /> initiation of f=ield work. <br /> 2. Llrsiug a(;cso Probe drilling e�ig uwnud xnd operated by V & W well drilling (C. <br /> 57 #7200) of Eio Vista CA, advance I soil boring to anticipated total depth <br /> of 30 feet. Soil aaiiiples will be collected for geological acid po5.5ibly analytical <br /> evaluation at five foot intervals. All Boil sampling equipinesit. will tie <br /> decontaminated between uses by washing w3ing a three bucket wash systeni <br /> and lab grade detergent or steam cleaner. <br /> 2437 Veteuman Ave.,##240 Gco-Plikee Envimnmental laal. (209)569-0293 <br /> Modrtsto,f A 9X5156 Fax('W,))969-0295 <br />