Laserfiche WebLink
FROM : CEO-PHASE EHU I Pte""IENTAL I hC PHFNE NO. : 209 5613 02q5 PO4 <br /> Work Plan-, Phase i1 FSA Page 3 <br /> r Project No, 171.2 <br /> March 2, 1098 <br /> The dete-&,ion liniitr, for these cvmpoustde are as follow,; <br /> Compound 1'YI�-C�a li_n� TP14 Dicaei Be i.ene 'I411 ueue Ethyl rienzene X9lcne <br /> Det.Limit soil 1.D 5.0 3.0 7,U <br /> _net_ u1nil (water) 0.01 0.050 0.3 0.1 �.3 — 0A <br /> TJnite mg/kg-L mglkg-L p$'/kg-L µK/1kg-1, µg/kg-L µg/kg-L <br /> 5. Chain of Custody ((.".0f1C.') forme will be used to track the handling of Hainples <br /> All d$tPt, timeq, pereons and companies handling, the samples will be listed <br /> from the time the sainple was collected to the tame of its ultimatr: disposal. <br /> G. Upon completion of the sail boring, the boring will be grouted using neat <br /> cement. Sol] cuttings will be underlain and covered by p188tie sheeting W <br /> await appropriate disposal. <br /> PERSONNEI. <br /> Geo-Phase Environmental Inc. Personnel <br /> • Stephen M_ Lankford, Regietered Gcolof,iHt, and ltegic�terCd <br /> Environ mental Avgessur. <br /> Richard i.. Dawson, Geologist_ <br /> Laboratory <br /> Sherwood Labs hi Hilinar, CA (DHS 1#1,400) <br /> Drilling Company <br /> V & W Drilling Inc. of Riu Vista (C-57 4720904). <br /> if you have any questions regarding this work plan or require addettunal <br /> information, please call 209-569-0293. <br /> Respectfully submitted <br /> E,W y�&A#�,1/1 <br /> o-Phase Environmental <br /> Inc. <br /> Richard i._ Daw, cA)n <br /> Project Geotugiat <br /> Awatjmmenta: <br /> &W Location Mapm <br /> Health and SHfply Tr w <br /> 2937 Venw-man Ava,M 8240 Geo-Phwe EnvirtnunenW ln+. <br /> Mad"a,CA 95:156 Fax('00)56-0295 <br />