My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2900 - Site Mitigation Program
>
PR0545766
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:58:34 AM
Creation date
9/9/2020 4:53:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545766
PE
2965
FACILITY_ID
FA0015802
FACILITY_NAME
JESSIES GROVE WINERY
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01305017
CURRENT_STATUS
02
SITE_LOCATION
1973 W TURNER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
each well and the hydraulic gradient,and a comparison of analytical results to applicable water quality <br /> standards. <br /> Every fourth Quarterly Report shall be expanded into an Annual Report. The annual report shall <br /> include the Quarterly Report for the most recent groundwater sampling event,plus a comprehensive <br /> evaluation of the wastewater generation and application operations. The Annual Report will include, <br /> but not be limited to, an expanded groundwater sampling list (see Table 1),the volume of all winery <br /> wastes generated during the year,a discussion of any needed improvements to the wastewater <br /> application system, and a discussion of the effectiveness of the system especially as it pertains to the <br /> quality of groundwater at the site and the agronomic application of waste. <br /> After a total of 16 independent groundwater samples have been collected, a statistical comparison of <br /> up-gradient and down-gradient groundwater quality will be conducted as part of the`Background <br /> Groundwater Quality Study Report"required by Item G.1.g.in the Order. The statistical comparison <br /> will employ one of the methods identified in Tide 27, §20415(e)(10) or equivalent. <br /> All reports of groundwater quality will be prepared under the direct supervision of a Registered <br /> Geologist or Registered Engineer. <br /> 7.0 Proposed Time Schedule <br /> Certain technical reports and activities required by the Order have,to date,not been completed. The <br /> proposed time schedule has been developed in order to bring the Facility into compliance in as short <br /> as time as possible.The proposed time schedule differs from that contained in the Order. <br /> Jessie's Grove Winery and Neil O.Anderson and Associates is prepared to install monitoring wells <br /> and report on well installation by March 1, 2005 provided approval of this work plan is received <br /> within 4 business days of its submittal. <br /> The first monitoring well sampling event will be scheduled for 2 weeks after well development is <br /> complete, and would include the annual parameter list. The first quarterly monitoring report would <br /> therefore be for the second quarter 2005 and would be submitted 30 days after sampling.Annual <br /> monitoring reports would be submitted during the second quarter of every year. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.