Laserfiche WebLink
I <br /> i <br /> i ( <br /> I <br /> r <br /> D. Results of TestinglServicing <br /> ! i <br /> Software Version Installed: 333.00 <br /> Com lets the following checklist: <br /> [rEjyeso is the audible alarm operational?Is the visual alarm operational? <br /> Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other eq prpent . M not intedere with their properoperation? <br /> If alarms are relayed to a smote monitoring station, is all communications equipment (e.g. , modem) o ration ? <br /> EI Yes [I No' For pressurized piping systems, does the turbine automatically shut dam if the piping secondary cont pment nitoring system detects a leak <br /> cited? If yes: which sensors initiate positive shut-dam? Ch a that apply) IR SumpRrench <br /> ❑ N/A fails to operate, or is electrically disconne <br /> Sensors, ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-dovm due to leaks az sensor failure/disconnection? ® Yes; ❑ No <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. , d ! mec a ipl overfill prevention valve is <br /> ® N/A installed), is the overfill waming alarm visible and audible at the tank fill point(s) and operating proper If s , t anal percent of tank capacity <br /> does the alarm trigger? .a <br /> ❑ Yes © No Was any monitoring equipment replaced? If yes, identify spec sensors, probes, or other equipme repWc d and list the manufacturer name <br /> and model for all replacement pads in Section E, below. ! <br /> CYes' ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check alt th apply) <br /> ❑ Product, 0 Water. If yes, describe causes in Section E, below. <br /> ® Yes ❑ No` Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if apphpble ! <br /> Q Yes ❑ No' is all monitoring equipment operational per manufacturer's specifications? '... <br /> In Section E below, describe how and when these deficiencies were or will be corrected. <br /> i <br /> STACY ON SITE WITH EH ALL PASSED . FOUND LEAK IN DISP 7-8 IN P ,INC . ITE WILL HAVE <br /> E. comments: VALVE REPLACED ASAP . . ALSO ADJUSTED FLOATS IN DISP 1 -2 5-6 NDif <br /> . <br /> It <br /> ff <br /> It <br /> zt <br /> It <br /> I <br /> I <br /> Monitoring System Certification Page 2 of 4 1 2/21 /07 <br /> H <br /> If <br />