Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: ❑ Check this box if lank gauging is u 01111 f r inventory control. <br /> ❑ Check this box if no tank gauging SIR e u pment is installed. <br /> This section must be completed if m tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ Not Has all input wiring been inspected for proper entry and termination, including testing for group, faults? <br /> ❑ Yes ❑ Now Were all tank gauging probes visually inspected for damage and residue buildup? <br /> i ; <br /> ❑ Yes ❑ Now Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ Not Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ Now Were all probes reinstalled properly? <br /> ❑ Yes ❑ No` Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed . <br /> Complete the followingchecklist: <br /> E7 Yes ❑ Not For equipment start-up or annual equipment certification, was a leak simulated to verify L 0, perf up iance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: 0 3 g p.h.; ❑ 0.1 g.p h , ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> El Yes ❑ Now Was the testing apparatus properly calibrated? <br /> © Yes ❑ Not For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ WA <br /> ❑ Yes ❑ No` For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> © WA <br /> ❑ Yes ❑ Not For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring Sys LrI is di led or disconnected? <br /> B WA <br /> ❑ Yes ❑ Not For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring Sys m mai ctions or fails a test? <br /> ❑ WA <br /> ❑ Yes ❑ Not For electronic LLDs, have all accessible vdring connections been visually inspected? <br /> © WA <br /> Q Yes ❑ Not Were all items on the equipment manufacturer's maintenance checklist completed? <br /> in Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> ALL 3 LDS PASSED <br /> i ; <br /> Monitoring System Certification Page 3 of 4 ! 2/21107 <br /> 1 <br /> ! i <br />