Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Pae s of s) <br /> XII . LINE LEAK DETECTOR TESTING <br /> FCheckx if line leak detectors {LLD) are NOT installed. (Do not complete this section.) y N NA <br /> This section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ❑ 3 GPH ❑ 0. 1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑ ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ❑ El <br /> El <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system Is disabled or disconnected? ❑ ❑ <br /> El <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ [] ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ ❑ <br /> Were all Items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ <br /> For any answer of "N" above, describe in Section X111 how and when these issues were or will be corrected. <br /> Xlli. COMMENTS <br /> Line Testing in Lieu of shutdown <br /> XIV. VACUUM 1 PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑X Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring Is used to penbrm leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By lois Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fal! ❑ Pma ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> El Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space Visual Inspection <br /> El Other Describe the method in section XV below. Gauge <br /> Was the vacuum or pressure restored to operating levels In all interstitial spaces? [] Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fait' above, describe In Section XV how and when these issues were or will be corrected, <br /> XV. COMMENTS <br /> GPH = Gdm Iyer Hoer, Y = Yes, N = No, NA = Not Appticable, VPH = VacuuTVPressureil ydrost r, ID = klentilication <br /> i <br />