My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 9:14:28 AM
Creation date
9/10/2020 10:20:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( o6 ots <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) In4ank liquid level probes (rf used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring rill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> 9iteAddreu; _ _ <br /> In Joanuin HospNal6 Entonetrina PbntSWW Hosp1W Franeh Camp <br /> KEY <br /> z A = ATTiIUM <br /> F= FII 1.3 <br /> T w TUMIE <br /> P = FROBE <br /> . I x ` SENSOR <br /> L = LeakDahsetce <br /> If = hkzvw <br /> RED DIESEL H MBsiee lessor <br /> . 1 = Smart Senor <br /> S M STP <br /> i <br /> Px C � FiestaACLassa <br /> . . . . . E • E $tep <br /> r Gen 1 <br /> DAY <br /> TAMC <br /> Gen 2 <br /> DAY <br /> TANK <br /> CIA <br /> . . <br /> UK Combuiu to Soilless q <br /> . . OPW Tank Gauge <br /> ' +PIPING • <br /> , 1 . . , Drawlasofpirmc <br /> exit of sump and <br /> UDC'a. ya <br /> ' t " ' pTFICE andrim®d <br /> . . . . . . . . 6 dmcv@* is <br /> i &VWltA We <br /> IF— .: Ted Post tarotspectlide <br /> . . blue gists. <br /> . . . . . DAY . <br /> TANK ✓' <br /> AMC -1 AM <br /> ebpr (aau waffsrou dAar arm not %*01. to at Verairg tsclerketauve a <br /> P^4A�brnlopirdononlYosoTararaJ� forW6»r�;onolPrvPasrr. Drawbw <br /> Wt to scute <br /> Data map was drawn &Uall) <br /> instructions <br /> N you already have a dhgram that shows all nqulred Information, you maayyindude i4 ralhu than th s page, with your Morrtoring t3ystam Cer6M1wdon. on your site plan, <br /> show the general layout of links and piping. Cleary ifentity bostloru oflfre following evipment, ifkutabet montiorkto systsn control purls; sensors mattdorerg tank <br /> annular spaoes, sumps, dispenser pare, spill walainers, or other secondary aoetaina+erdareas; meahankal or eledronio h m leak delecbrs; and in-task talsdd lava] <br /> probes (I used for leak deleetion). In the spam provided, note the date this Ste Phn was prepared. <br /> 00000001 <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.