My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1085
>
2900 - Site Mitigation Program
>
PR0535111
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 11:04:44 AM
Creation date
9/10/2020 10:47:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535111
PE
2959
FACILITY_ID
FA0020295
FACILITY_NAME
GORDON
STREET_NUMBER
1085
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95337
APN
22224012
CURRENT_STATUS
01
SITE_LOCATION
1085 S UNION RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS Mr. McKinley Lewis, Jr. <br /> April 20, 2011 <br /> the control of ARCADIS that would affect the schedule(e.g., barriers to site access, <br /> delays caused by subcontractors). <br /> ARCADIS prepared this Addendum to the PEA Work Plan for the DTSC in a manner <br /> consistent with the level of care and skill ordinarily exercised by professional <br /> engineers, geologists, and environmental scientists in the geographic area of the <br /> Site. ARCADIS provides no other warranties, either express or implied, concerning <br /> the contents of this Addendum to the PEA Work Plan,which was prepared under the <br /> technical direction of the undersigned. <br /> Please feel free to contact either of the undersigned at 916.786.0320 if you have any <br /> questions or comments concerning this Addendum or the project in general. <br /> Sincerely, <br /> ARCADIS U.S., Inc. <br /> Cheryl Haines, REA I Alan D. Gibbs, P.G., C.HG. <br /> Certified Project Manager Vice President/Principal Hydrogeologist <br /> California P.G. No. 4827 <br /> Attachments: <br /> Attachment 1. PEA Tables <br /> Attachment 2. Figure 1 <br /> Distribution List: <br /> Enclosure (1 original, 2 copies) <br /> Mr. McKinley Lewis, Jr. <br /> Hazardous Substances Engineer/Project Manager <br /> Cleanup Program—Sacramento Office <br /> Department of Toxic Substances Control <br /> 8800 Cal Center Drive <br /> Sacramento, California 95826 <br /> Page: <br /> Final PEA Work Plan Addendum-AprILRV009808.doc 9/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.