My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2900 - Site Mitigation Program
>
PR0535015
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:00:47 PM
Creation date
9/11/2020 12:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535015
PE
2960
FACILITY_ID
FA0020252
FACILITY_NAME
PG&E MCDONALD IS COMPRESSOR STATION
STREET_NUMBER
1181
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
TRACY
Zip
95234
APN
12908052
CURRENT_STATUS
01
SITE_LOCATION
1181 ZUCKERMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � Page 2 of 2 <br /> Thanks for your help over the phone today and for letting us know about San Joaquin County's <br /> requirement for 2" of annular space for grouting. I spoke with Ralph at Woodward Drilling, and we <br /> would like to do the following to ensure that there is at least 2 inches of annular space for the <br /> grouted extent of the well: <br /> Use direct-push 3.5" probes to drill to the total depth (17 feet bgs)as described in workplan,then <br /> over drill with 8" hollow stem augers (this can still be done with a direct-push rig)to planned top of <br /> bentonite (6 ft bgs).The pre-packed well will then be built through the probe rods as described in <br /> the workplan (10' screened interval, one foot of bentonite), and then we will pull the probe rods to <br /> the bottom of the auger, and then grout though auger to surface.Aside from the plan for <br /> overdrilling the top six feet of the well, all other details on the construction will be unchanged from <br /> the plan presented in the workplan and original permit application. <br /> Could you please confirm that this is acceptable to you? <br /> Thank you, <br /> Julie <br /> Julie Shortridge I Staff Environmental Engineer I i�Llie.shortridgp@arcadis-us.com <br /> ARCADIS U.S.. Inc. 13101 Wilson Blvd. Suite 550 1 Arlington,VA 22201 <br /> T. 202.679.6535 <br /> www.arcadis-us.com <br /> ARCADIS, Imagine the result <br /> Please consider the environment before printing this email. <br /> NOTICE: This e-mail and any files transmitted with it are the property of ARCADIS U.S., Inc. and its <br /> affiliates. All rights, including without limitation copyright, are reserved. The proprietary information <br /> contained in this e-mail message, and any files transmitted with it, is intended for the use of the <br /> recipient(s)named above. If the reader of this e-mail is not the intended recipient, you are hereby <br /> notified that you have received this e-mail in error and that any review, distribution or copying of this <br /> e-mail or any files transmitted with it is strictly prohibited. If you have received this e-mail in error, <br /> please notify the sender immediately and delete the original message and any files transmitted. The <br /> unauthorized use of this e-mail or any files transmitted with it is prohibited and disclaimed by <br /> ARCADIS U.S., Inc. and its affiliates. Nothing herein is intended to constitute the offering or <br /> performance of services where otherwise restricted by law. <br /> 8/15/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.