My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 2:29:11 PM
Creation date
9/11/2020 2:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13 : DIMPLE FIRST HOLE <br /> Remove tool . Remove any chips or burrs from the STEP 15 : DIMPLE REMAINING HOLES <br /> drilling operation . Place the assembly on a solid Remove any chips or burrs from the drilling <br /> surface . Using the punch supplied with the 71SO - operation . Dimple the next (2 ) holes as done in Step <br /> TOOL and 71 SO -TOOLC , align the tip of the punch 13 . Make sure the assembly is on a solid surface <br /> with the drilled hole and dimple the upper drop tube when punching . After punching , remove any chips <br /> by striking the punch with a hammer until the drop that may have fallen into the inlet tube screw hole . <br /> tube is formed into countersunk hole in the inlet <br /> tube . After punching , remove any chips that may <br /> have fallen into the inlet tube screw hole . <br /> Align punch with <br /> drilled hole <br /> L7 i <br /> o i <br /> Figure 15 <br /> STEP 16 : ASSEMBLE OTHER SCREWS <br /> Apply black moly grease to screws and tighten the <br /> other (2 ) screws into inlet tube with a screwdriver as <br /> done in Step 14 . Use only the taptite screws that <br /> are supplied with the unit . Seating torque is 20 in - <br /> Figure 13 lbs min . to 35 in - lbs max . Do not over tighten . <br /> STEP 14 : ASSEMBLE FIRST SCREW STEP 17 : APPLY GREASE TO LOWER O - RING <br /> Ensure that the drop tube was formed into the AND BODY THREADS <br /> countersunk screw hole as shown in Figure 14 if not Apply black moly grease to the lower tube o- ring and <br /> return to step 13 . Apply black moly grease to screw body threads as shown . Make sure coverage is <br /> and tighten first screw into inlet tube with a completely around the o-ring . Install o- ring in groove <br /> screwdriver . Use only the taptite screws that are just above threads , <br /> supplied with the unit . Seating torque is 20 in - lbs <br /> min . to 35 in -lbs max . Screw head should be flush Apply grease <br /> with the drop tube . Do not over tighten . around o-ring <br /> tt <br /> Ensure the drop tube is O - ring <br /> formed into countersunk hole groove Body threads <br /> Figure 17 <br /> i <br /> Figure 14 <br /> 70 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.