FAR <br /> DESIGN <br /> VEEDER ROOT CARBON CANISTER VAPOR POLISHER Architectural <br /> Solutions Group <br /> COMPLIANCE AND INSTALLATION NOTES 2455EemettVa2eyRd. Safe A_1D2 <br /> Saafa Rosa. CA. 95441 <br /> THESE NOTES ARE MPUCABLE TO NEW AND RETROFIT INSTALLATIONS <br /> LOCATION OF VAPOR PROCESSING EQUIPMENT CA FIRE CODE, ADDITIONAL INSTALATION NOTES: ADDITIONAL INSTALLATION NOTES AT DISPENSEBS• <br /> CFC 2010 H)22D6.7.9.2.2 LOCATION 1 , ALL INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER 11 SOME DISPENSER NOZZLES HOLSTERS ARE NOT COMPATIBLE WITH THE ED ARCN�r <br /> INSTALLATIONS SHALL BE RENEWED BY BP LOGISTICS FOR APPROVAL CURRENT VST DESIGN, CONSULT WITH BP PROJECT MANAGER FOR A USTP <br /> `c <br /> EQUIPMENT VAPOR—PROCESSING EQUIPMENT SHALL BE LOCATED AT OR ABOVE PRIOR M SUBMITTALS TO AUTHORITIES HATING JURISDICTION AND OF DISPENSERS THAT ARE NOT COMPATIBLE WITH THE DESIGN AND DO NOT v Y <br /> GRADE SOURCES OF IGNITION SHALL. BE LOCATED NOT LESS TFWJ 50 FEET RE—REVIEWED BY BP LOGISTICS AFTER PERMIT APPROVALS ARE OBTAINED, INSTALL VST AT LOCATIONS WHERE THESE DISPENSE <br /> ADDITIONALLY INDIVIDUAL SITE PLANS NEED TO BE REVIEWED BY THE ECS <br /> DISPENSERS EXIST, <br /> (15240MM) FROM FUEL—TRANSFER AREAS AND NOT LESS THAN 18 INCHES TO MAKE SURE THERE ARE NO SENSITIVE RECEPTORS WITHIN 1000 FEET 2, THE PRESSURE SENSOR LOCATED IN THE DISPENSER SUMP CLOSEST TO RBd. 1/31 /19 <br /> (457.2MM) ABOVE TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS, OF THE EQUIPMENT LOCATION. THE TANK FARM SHALL BE PREFERABLY MOUNTED OUTSIDE THE DISPENSER <br /> (VAPOR—PROCESSING UNITS SHALL BE LOCATED NOT LESS THAN 10 FEET 2. ON EXISTING FACILITIES CONTRACTOR TO PERFORM LIQUID AND VAPOR CONTAINMENT SUMP OR PRESSURE SNITCH TO ABO E THE HIGHEST <br /> PC ENETRATION TO FITTING, <br /> THE OFC 00 <br /> 3048MM FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY TIGHTNESS TEST ON VENT UNES PRIOR TO PROCEEDING WITH INSTALLATION <br /> WHICH CAN BE BUILT UPON. OF THE VEEDER ROOT SYSTEM, REPORT TO BP PRODUCT MANAGER WITH sed <br /> EXCEPTION: WHERE THE REQUIRED DISTANCES TO BUILDINGS, PROPERTY RESULTS. 3, THE PRESSURE SENSOR MUST BE INSTALLED IN THE VERTICAL POSITION, <br /> LINES OR FUEL-TRANSFER AREAS CANNOT BE OBTAINED, MEANS SHALL. BE SENSING PORT POINTING DOWN, AND WHEN REQUIRED BY AUTHORITY HAVING <br /> PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE, ACCEPTABLE 3, THE VENT DISCHARGE SHALL BE LOCATED AND DIRECTED SO THAT VAPORS JURISDICTION, THE CONNECTION TO THE VAPOR UNE MUST BE BELOW THE p <br /> MEANS INCLUDE, WILL DISPERSE VAPORS SHALL BE DIRECTED UPWARD AND HORIZONTALLY SHEAR VALVE <br /> 1 . APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT LEASE 18 AWAY FROM ADJACENT WALLS, VENT OUTLETS SHALL BE LOCATED SO AS <br /> INCHES (457.2MM) ABOVE THE EQUIPMENT, CONSTRUCTED OF FIRE-RESISTANT NOT TO BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND Stall BE 4. THE 3-WAY VALVE TEST PORT ON THE PRESSURE SENSOR IN THE <br /> OR NON-COMBUSTIBLE MATERIALS OR AT LEAST 5 FEET FROM BUILDING OPENINGS, DISCHARGE SHALL NOT BE DISPENSER CLOSEST TO THE TANK FARM SHALL BE 'CAR SEALED' WITH <br /> 2. FIRE PROTECTION USING M APPROVED WATER-SPRAY SYSTEM, LESS THAN 12' FROM FINISH GRADE VENTS SHALL BE INSTALLED IN LABELS INDICATING CORRECT OPERATING POSITION, VALVE TO REMAIN <br /> ACCORDANCE WITH NFPA 30 (2012). CLOSED FOR NORMAL OPERATION TO AVOID FALSE PRESSURE READING BY - <br /> VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED A MINIMUM OF 20 FEET THE ISO SOFTWARE <br /> (6096MM) FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE 4. VENT RISERS SHOULD STAND NO LESS THAN 3' FROM THE OUTSIDE OF <br /> PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE CURB. 5, THE DISPENSERS MUST BE A BALANCE TYPE DISPENSER, <br /> ENCLOSURES OR FENCING, WHEN APPROVED PROTECTIVE ENCLOSURES ARE <br /> USED, APPROVED MEANS SHALL BE PROVIDED TO VENTILATE THE VOLUME 5. THE CONTRACTOR IS RESPONSIBLE FOR SHORING AND THE PROTECTION IN 6. THE DISPENSERS MUST BE CMB APPROVED UNIHOSE TYPES UNLESS <br /> WITHIN THE ENCLOSURE TO PREVENT POCKETING OF FLAMMABLE VAPORS, PLACE OF EXISTING FACILITIES, PERMITTED BY AUTHORITY HAVING JURISDICTION, <br /> IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE VAPOR-PROCESSING 6, MAINTAIN 5 FEET CLEAR AROUND CARBON CANISTER VAPOR POLISHER 7, THERE SHALL BE NO FLOW UMITERS ALLOWED FOR THE VST SYSTEM, <br /> UNIT FROM A FUEL-TRANSFER AREA, THE CHIEF IS AUTHORIZED TO REQUIRE FOOTPRINT TO GRADE, <br /> ADDITIONAL SEPARATION BY DISTANCE AND HEIGHT, 8, FOLLOW PEI RP-400 FOR ELECTRICAL CONTINUITY OF HANGING HARDWARE , <br /> 7. BALL MAT VALVES ARE CURRENTLY INSTALLED AS BP STANDARD <br /> CFC 2010 $2206.7.9.2.3 INSTALLATION PRACTICE FOR PROTECTION OF WETTING OF THE VENT AND STAGE It VAPOR 9. THE VST HANGING HARDWARE WS THE OPTION OF LONGER HOSE LENGTHS, <br /> VAPOR-PROCESSING UNITS SHALL BE SECURELY MOUNTED ON CONCRETE, PIPING, CONTRACTOR TO CONFIRM THE EXISTING INSTALLATION AND MAXIMUM HOSE LENGTH WHEN CONNECTED IS UMTED TO 15'-0' CONSULT <br /> MASONRY OR STRUCTURAL STEEL SUPPORTS ON CONCRETE OR OTHER REPLACE ALL BML FLOAT VALVES AT EXISTING FACILITIES, WITH DISPENSER MANUFACTURER FOR EXTENDED HOSE REACH DESIGN <br /> NON-COMBUSTIBLE FOUNDATIONS. OPTION. <br /> 8, CONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT <br /> NOTE BP DOES NOT PERMIT THE VAPOR-PROCESSING EQUIPMENT TO BE PRODUCT VENT TIE IN TO AVOID PRODUCT CONTAMINATION AND IMPROPER <br /> INSTALLED ON ROOFS OF BUILDINGS OR CANOPY STRUCTURES SEF ALTERNATE PROCESSOR TIE-IN, PROVIDE CONFIRMATION ON PIPE AND TANK CHECKLIST TESTING NOTES <br /> MOUTHING DETAIL FOR EXISTING SITES WHERE VENT RISERS AR MOUNTED AT ((ABET_ MAIRER OK). 000 NO INSTALL ON DIESEL' i z w <br /> PER CARD E0. VR-204 ALL EXISTING SINGLE WALL VENT AND VAPOR PIPING <br /> RODES, 9, THERE SHALL BE NO POCKETS OR LIQUID TRAPS IN ANY OF THE INSTALLATIONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SWJl N VI F 0 <br /> z <br /> EXISTING CONDITION CONNECTED PIPING FROM THE VEEDER ROOT CARBON CANISTER VAPOR HAVE THE FOLLOWING TESTS TO BE COMPLETED WITHIN 60 DAYS AFTER > a <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXISTING POLISHER TO THE VENT STACK TIE-IN POINT. START-UP AND AT LEAST ONCE IN EACH 12 MONTH PERIOD USING THE o a w w 0 <br /> CONTROLLING SITE CONDITIONS AND FOR COMPLIANCE WITH LOCAL ORDINANCES FOLLOWING TES( PROCEDURES. - < w Y 0 0 <br /> AND CURRENT CALIFORNIA BUILDING CODES. 10. THE VENT STACK RACK AND RISERS SHALL BE GROUNDED. TIE THE wo 0 0 <br /> GROUND WIRE FROM THE VENT STACKS TO THE Uw ST SYSTEM GROUND. TP-201.3 DETERMINATION OF 2-INCH WC STATIC PRESSURE z w N o z <br /> APPLICABLE BF PERFORMANCE OF VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIES o 0 z a m 00 <br /> ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF 11, PRIOR TO PERFORMING MAINTENANCE, TEST PORT VALVE MUST BE VENTED (March 17, 1999); g z F <br /> THE CALIFORNIA BUILDING CODE AND REFERENCED STANDARDS. TO ATMOSPHERE. <br /> TP-201.4 DYNAMIC BACK PRESSURE (July 3, 2002) IN ACCORDANCE m a a o <br /> M a LL a a <br /> PUNS AND PERMITS: 12. VEEDER ROOT SYSTEM TO BE LEAK-TESTED PRIOR TO START-UP TO AVOID WITH THE CONDITION LISTED IN ITEM 1 OF THE VAPOR COLLECTION ¢ ¢ a <br /> THE CONTRACTOR SHALL OBTAIN ALL NECESSARY ENCROACHMENT PERMITS AND LEAKAGE TO ATMOSPHERE. SECTION OF EXHIBIT 2 OF THE VR-204 EXECUTIVE ORDER; IN ADDITION F <br /> SHALL POSSESS APPROVED PUNS PRIOR TO BEGINNING OF CONSTRUCTION. BP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY 6 N z N <br /> 13. ANY SPENT CARBON FROM CANISTER SHALL BE TREATED AS HAZARDOUS <br /> UTILITY LOCATKINS: WASTE AND DISPOSED OF PROPERLY EXHIBIT 4 OF THE VR-204 EXECUTIVE ORDER, REQUIRED ITEMS IN m <br /> THE CONTRACTOR WILL BE REQUIRED TO NOTIFY MEMBERS OF UNDERGROUND CONDUCTING TP-201 .3; mo N N <br /> SOME ALTER (U.SA) 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION 14, INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR POLISHER FOR <br /> WORK BY CALLING THE TOLL-FREE NUMBER (BDO)-227-2600. EXCAVATION DAMAGE PRIOR TO STMT UP OR RE-COMMISIMING AFTER SERVICE, EXHIBIT 5 OF THE VR-204 EXECUTIVE ORDER, LIQUID REMOVAL TEST <br /> FOR THE PURPOSE OF THIS REQUIREMENT, IS DEFINED AS BEING 18' OR PROCEDURE; <br /> MORE IN DEPTH BELOW THE EXISTING SURFACE ELECTRICAL INSTALLATION NOTES <br /> EXHIBIT 6O THE VR-204 EXECUTIVE ORDER, HYDROCARBON SENSOR f <br /> 1 . ALL ELECTRICAL INSTALLATIONS ME TO BE PER NEC/CEC CODE FOR THE VERIFICATION TEST; <br /> AREA INSTALLED, INSTALLATION IN A CLASSIFIED AREA IS M EXCEPTION EXHIBIT 8 OF THE VR-204 EXECUTIVE ORDER, VAPOR <br /> TO THE NORMAL SITING AND SHALL REQUIRE FURTHER RENEW OF BP PRESSURE SENSOR VERIFICATION TEST; <br /> PROJECT MANAGER. <br /> 2, ENSURE THE VEEDER ROOT CARBON CANISTER VAPOR POLISHER IS EXHIBIT 9 OF THE YR-204 EXECUTIVE ORDER, DETERMINATION OF VST <br /> BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK PROCESSOR ACTIVATION PRESSURE; <br /> GROUNDING SYSTEM TO ELIMINATE THE POSSIBILITY OF ELECTRICAL AND EXHIBIT 11 OF THE VR-204 EXECUTIVE ORDER, OPERABILITY TEST <br /> DISCHARGE AS M IGNITION SOURCE PROCEDURE FOR THE VEEDER-ROOT ISD FLOW METER, <br /> 3. BONDING AND GROUNDING: BONDING AND GROUNDING GUIDELINES FOR SHORTER TIME PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL <br /> < CONSTRUCTION REGARDING DISPENSING EQUIPMENT ARE TO BE IN PLACE DISTRICT REQUIREMENTS, NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST W <br /> Z' <br /> AND IN ACCORDANCE WITH PETROLEUM EQUIPMENT INSTITUTE (PEI), <br /> RESULTS, SHALL BED DONE IN ACCORDANCE WITH LOCAL. DISTRICTQ Ch <br /> REQUIREMENTS ST PURSUANT t I POLICIES ESTABLISHED BY THAT DISTRICT, <br /> 9 ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS THE <br /> THE <br /> TH <br /> TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY E ARB 0 <br /> EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO YIED � <br /> EQUIVALENT RESULTS. IT IS FURTHER ORDERED THAT THE FOLLOWING 0 V <br /> REQUIREMENTS ARE MADE A GONOMON OF CERTIFICATION, THE OWNER OR <br /> OPERATOR OF THE VST PHASE II EVR SYSTEM INCLUDING VEEDER-ROOT ISD <br /> SUL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN 60 DAYS <br /> AFTER STARTUP USING THE FOLLOWING TEST PROGEOUREO EXHIBIT 10, NOZZLE (n Q <br /> BAG TEST PROCEDURE NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST U <br /> RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT <br /> n REQUIREMENTS AND PURSUANT TO THE POLICIES ESTMUSHED BY THAT (� <br /> DISTRICT. ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS <br /> OF THE TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY O Q <br /> THE ARB EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, O <br /> RTO YIELD ESULEQUIVALENT <br /> N <br /> w <br /> 3 <br /> AI <br /> 8 <br /> Prgeat Number <br /> SPA16002 . 0 <br /> re <br /> Sheet dame <br /> s <br /> YEEDER•fl00T <br /> ARBON CANISTER VAPOR POLISHER <br /> MPUAMCE AND INSTALLATION NOTE <br /> (CALIFORNIA ONLY) <br /> b <br /> t3 <br /> . Sheet Nu�mbaf <br /> N <br />