Laserfiche WebLink
THICKEN CONCRETE SLAB TO PAA2 HP VARIABLE SPEED TURBINE W/ 0 0 BELOW <br /> W WHERE SECONDARY <br /> 3 GPH ELECTRONIC LEN( DETECTION CONTAINMENT OF SUMP ENDS, <br /> W/ SIPHON PORT FOR VACUUM SOURCE 0 45' DIA ACCESS �.). DIMENSION REWIRED <br /> 0 VARIES WITH FIELD CONDITIONS, DESIGN <br /> MINI HYDROSTATIC SENSOR IN BRINE SEE NOTES BELOW MANHOLE <br /> FACTORY SUPPLIED RESERVOIR 1 3O' LD, 18' 1-1/2` MIN. CROWN Are hiteetural <br /> (TYP. ALL OPENINGS) <br /> •) Solutions Group <br /> 6WIDE DETECTABLE <br /> UNDERGROUND MARKING <br /> I 2155 eerxrett Vc1ey Rd. Sole A-102 <br /> 3' PEA GRAVEL MIN. TO—1z _ TAPE EMPIRE NAGNATEC <br /> PREVENT LOAD TRANSFER 131 -143 Santa Rosa, CA. 95401 <br /> TO TOP OF TANK (8' MIN. 12' MAX.) <br /> 2-IN-1 SENSOR BOX 1 19 SEN. OFF W/ DRAIN <br /> 6 2' BALL VALVE SEDARCH,lF <br /> J-DOX (TYP.) 8 - y r <br /> 7 2'x24' FLET( (TYP.) y. <br /> 2 SENSOR-NO TANK VACUUM SENSOR 1 LOOP VACUUM TUBING FROM <br /> ASSEMBLY KR W/ MOUNTING BRACKET PRODUCT PIPING TO VAC SENSOR <br /> RBI. I/31/19 <br /> SEAL-OFF (TYP.) 79 4 2 1' FRP BONDED ENTRY FITTING (TYP.) <br /> i ' HOMERLIN TO BLDG, TURBINE POWER yr P <br /> 1 ' FRP BONDED ENTRY FITTING2IN �(ROBROY THROUGH SUMP ONLY) Sea 9tfOF CALLFOR2 <br /> (TYPTING <br /> 2 � 3' O.W. FRP BONDED ENTRY <br /> FITTING & 4x3' CONCENTRIC <br /> REDUCER W/ TEST PORT & PLUG I� <br /> 1 ' MONITORING CONDUIT B _ p <br /> (ROUTED TO INTER99N I — 4 4 CROSSOVER22• FIBERGLASS <br /> VACUUM <br /> (ROBROY THROUGH 511MP ONLY) <br /> 48' DOUBLE WALL BRINE MONITORED Y FILL SUMP <br /> SUMP ACUUM MONITORED 4 <br /> 4 2' INSIDE 3' FRP PRODUCT LINE TO <br /> DISPENSERS (VACUUM MONITORED) <br /> SUMP LIQUID MONITORING SENSORAH 2 2 3' D.W. FRP BONDED ENTRY FITTING <br /> (IN SENSOR HOLDER BELOW APEX 0�A 22' MANWAY W/ 4x3' CONCENTRIC REDUCER W/ <br /> OF TANK AT LOWEST POINT) TEST PORT & VACUUM TUBING LOOPED <br /> TO VAC SENSOR ASSEMBLY (ryP.) <br /> NOTE: <br /> SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING <br /> PENETRATIONS AS SHOWN <br /> A: SECTION VIEW - 1 OK DIESEL - ONE PUMP , ONE LINE C: NOT USED E: NOT USED <br /> SCALE, 3/4' a i '-D' SCALE NIS SCALE: NIS Q <br /> z N <br /> m 9 o z <br /> 3' OVER 2' FIBERGLASS CROSSOVER N rn F o <br /> 4 4 CONTAINS V UUN 1�FROM <br /> FILL SUMP VACUUM MONITORED) O a ¢ w <br /> 2' CAP, DRILL HOLES IN END AN INSTALL "' <br /> 4 y O N <br /> GROMMETS FOR TUBING PASS THROUGH I 2 2 o w z <br /> 6 I 3' MW. FRP BONDED ENTRY <br /> I FITTING & 4x3' CONCENTRIC > O o 0 <br /> 1 ' MONITORING CONDUIT B REDUCER W/ TEST PORT & PLUG <br /> (ROUTED TO INTERSTITIAL) z = to 0 o <br /> (ROBROY THROUGH SUMP ONLY) 1 ' CONDUIT HOMFRUN TO BLDG. TURBINE w m ¢ a o ? <br /> O POWER (ROBROY THROUGH SUMP ONLY) <br /> 1 ' FRP BONDED ENTRY FITTING 4 _ g a a F a w a <br /> •) 2 -1 ' FRP BONDED ENTRY FITTING OYP.) ? v N <br /> J-BOX (IYP.) 8 r <br /> 20x24' FLEX (TYP.) w w <br /> e/ \e <br /> a • 48' DOUBLE WALL BRINE o <br /> • \ Ie <br /> MONITORED SUMP <br /> 22' W~WAY Il <br /> 2 SENSOR-NO TANK VACUUM SENSOR 2' INSIDE 3' FRP PRODUCT LINE TO <br /> ASSEMBLY TOT W/ MOUNTING BRACKET 1 iL 4 DISPENSERS (VACUUM MONITORED) <br /> O <br /> 2 HP VARIABLE SPEED TURBINE W/ p 0 � <br /> 3 GPH ELECTRONIC LEVO DETECTION <br /> W/ SIPHON PORT FOR VACUUM SOURCE 0 0 <br /> LOOP VACUUM TUBING FROM 2 2 3' D.W. FRP BONDED ENTRY FITTING <br /> PRODUCT PIPING TO VAC SENSOR & 4x3' CONCENTRIC REDUCER W/ <br /> TEST PORT & VACUUM TUBING Q0 <br /> 2' BELLxMALE ADAPTER (TYP.) 4 LOOPED TO VAC SENSOR ASSEMBLY Q 2 <br /> (TYP.) <br /> s 0 w <br /> NOTE: THE LAST 2 FEET (MINIMUM) OF CONDUITS THAT O U <br /> ENTER THE DOUBLE WAIL SUMP SHALL BE PVC COATED <br /> � <br /> B : PLAN VIEW . 10K DIESEL - ONE PUMP , ONE LINE RIGID, D: NOT USED F: NOT USED <br /> (n Q <br /> SCALE: 3/4' a 1'-0' SCALE: NTS SCALE' NTS w 0 <br /> S MINI HYDROSTATIC L 34` Lid 0.4 FIBERGLASS PIPING, 2' NOMWAL, BONDED TO SUMP SUMP 2 WIRE U <br /> SENSOR OR UDC INNER WALL USING GASOUNE COMPATIBLE SHIELDED EM HOLDER MUST NOT <br /> n EPDXY RESIN. BOTTOM OF PIPE TO BE IN CONTACT CABLE TOUCH THE TANK SURFACE LLO Q <br /> FACTORY SUPPLIED _ 32-3/4' Neck O.D. WITH LOWEST PART OF SUMP OR UDC. SO THAT LIQUID CAN TRIP 0 <br /> SUMP RESERVOIR THE SENSOR, a <br /> A <br /> n I L__41 CTOR TO BOND UNISTRUT CHANNEL TO O SUMP MONITOR LIQUID <br /> I I <br /> HOLDER TO ALLOW FIBERGLASS PIPE TO CLEAR HOLDER <br /> R INSIDE <br /> / SUMP COLLAR 'UP'. CONTRACTOR TO USE APEX OF <br /> / 30' LD, 'NOTE: GASOUNE-COMPATIBLE EPDXY TO BOND SPACER TO � I TANK <br /> SLIP ON RISER CONTRACTOR SHALL T, <br /> BE HELD RESPONSIBLE FOR PROPER INSFALLA71ON & SUMP AND PIPE. CONTRACTOR MAY USE UNISTRU <br /> ROUND BODY EXTENSION SUMPS <br /> PER MANUFACTURERS INSTRUCTIONS AND SHALL REINSTALL FIBERGLASS PIPE, OR ANY OTHER EQUIVALENT <br /> SUMPS IF HYDROSTATIC TESTING SHOWS LEAKING IN THIS AREA OF THE MATERIAL THAT CAN WITHSTAND ENVIRONMENT OF <br /> FIELD SEALED JOINT. SUMP. SUMP. <br /> (ADHESIVE SUPPLIED 48' I'D' - Project tl tuber <br /> W/ KIT) SPA16002 . 0 <br /> _ _ _ (� a e SUMPS MUST BE ORIENTED SUCH THAT THE FACE OF THE SUMP PANEL IS TURBINE SIDE SUMP SENSORS TO BE MOUNTED FIBERGLASS <br /> I I r \ PARALLEL WTIN ADJACENT TANK SUMP PANEL IN ORDER TO ACHIEVE THE 45• BELOW APEX OF TANK, AT BOTTOM OF SUMP AT <br /> f ANGLES REQUIRED TO ROUTE THE PIPING WHILE MAINTAINING THE DESIRED SIDE OF TANK WHERE PRODUCT PENETRATIONS INTO TANK Sheet Name <br /> I SUMP ARE MADE AND BELOW LOWEST PENETRATION <br /> i PERPENDICULAR ANGLE INTO THE SUMP. FIBERGLASS SUMP <br /> m I 3/8 % 1/4 SSI FACTORYFITTING WITHIN SUMP AREA. PRODUCT PIPING TO <br /> BUSHING DISPENSERS, PRODUCT PIPING CROSS CONNECTION INSIDE TANK COLLAR TURBINE SIDESUMPS AND PIPING <br /> m I <br /> INSTALLED I FO AT I LAY-UP <br /> FACTORY / &_< BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS LIP <br /> COLLAR BONDED ARE DESIGNED TO EWER THE SAME SIDE OF THE UNISTRIJT 1 . SENSOR HOLDER INSTALLATION DETAILS <br /> TO TANK / SUMP AS SHOWN, IF PRODUCT PENETRATION CHANNEL BONDED TO UNISTRUF (SINGLE 2HP TURBINE) <br /> f CONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT CONNECTION <br /> o O ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD <br /> ` I JOINT DETAILS f C 7. - G-7 FOLLOAWMG CURING OF NXIFSNE. SPECIFIC ATTENTION MUST BE GIVEN TO CONDITIONS, THEN DUAL SENSORS AT TURBINE CHANNEL <br /> b SURFACE PREP AS TESTING REQUIREMENTS WILL DETECT THE SMALLEST OF <br /> o I I I I I FLAWS, ALL MATERIALS MUST BE COMPATIBLE WITH GASOUNE, GASOLINE SUMP WILL BE REQUIRED TO BE INSTALLED. <br /> I WITH 15X MTBE (METHYL TOMW-BUTYL ETHER), OR GASOLINE WITH 10% ANSENSOR UU'r NKM CONTRACTOR TO USE ADDITIONAL <br /> ETCH (ETHANOL), FIBERGLASS AND RESIN MUST EXTEND 1/2' BEYOND CHANNEL BONDED TO GALVANIZED FI TONGS AS REQUIRED TO Sheet Number <br /> COVERAGE OF ADHESIVE SUMP WALL. DO NOT MINIMIZE BENDS IN FLEXIBLE CONNECTORS �I <br /> & 48' DIA POLYGON SUMP BODY 1/4' DRAIN/TEST BUSHING. PENETRATE SUMPI 5 <br /> G : DOUBLE WALL TURBINE SUMP RISER (8-20'X 19' FIAT PANELS) FACTORY INSTALLED H : SUMP SENSOR HOLDER DETAILSIBMATEL INDICATES ITEMS FOUND ON <br /> f SP : NTS SCALE: 1" = J � Erl IBMATERIALS LIST SHEETS M.5.3.01 & M.5.3.02 M ■ ■ 3 ■ <br /> i <br />