Laserfiche WebLink
. FW: MSE contact Page 1 of 8 <br /> Harlin Knoll [EH] <br /> From: Robert Ellgas [rellgas@msegrp.com] <br /> Sent: Friday, September 04, 2009 5:04 PM <br /> To: Harlin Knoll [EH] <br /> Cc: Tyrone Evans; Blair Hupcey <br /> Subject: Re: McDonald Island Well Decommissioning: Plan for 9/8/09 <br /> Harlin - Early a.m. will work for both Tyrone and RSI, if that means after about 7:30 a.m. to about 8:30 a.m. <br /> Tyrone should have completed confirming that markers are still present by 7:30 so you can easily inventory the <br /> wells listed on the permit, and RSI should have completed (or be in the process of completing)the MW-11 <br /> mushroom cap by 8:30 so you can observe it(the other mushroom caps have already been covered with soil as <br /> the final step in decommissioning). If you can arrive at 7:45-8:00 1 will be able to accompany you for the well <br /> inventory. When you show up at the site you will need to check in with Operations (second floor of first <br /> compressor station to right). Tyrone can either meet you there or you can meet him at the intersection of the two <br /> access roads that run on the north and east sides of the ponds (continuing north on the road to the left of the <br /> compressor station where you check in). Tyrone's cell is 408-910-5606 if you need contact him, although cell <br /> coverage is hit-or-miss on the island. Robert <br /> From: Harlin Knoll [EH] <HKnoll@sjcehd.com> <br /> To: Robert Ellgas <rellgas@msegrp.com> <br /> Sent: Friday, September 4, 2009 4:32:02 PM <br /> Subject: RE: McDonald Island Well Decommissioning: Plan for 9/8/09 <br /> 1 have to do the inspection either early am or mid pm. <br /> From: Robert Ellgas [mailto:rellgas@msegrp.com] <br /> Sent: Friday, September 04, 2009 2:40 PM <br /> To: Harlin Knoll [EH] <br /> Cc: Tyrone Evans <br /> Subject: Fw: McDonald Island Well Decommissioning: Plan for 9/8/09 <br /> Harlin, <br /> FYI. I will call you at around 8:30 a.m. to confirm that the mushroom cap on MW-11 has been (or is being) <br /> completed and to arrange your arrival time. Per item 5) below, as we previously discussed, please provide <br /> e-mailed approval for spreading the soil mounds in place. <br /> Thank you, and enjoy your Labor Day weekend, <br /> Robert <br /> Robert A. Ellgas, Ph.D. <br /> Program Manager <br /> MSE Group <br /> 302 Pendleton Way <br /> Oakland , CA 94621 <br /> 510-383-9600 <br /> 510-383-9300 fax <br /> ----- Forwarded Message ---- <br /> From: Robert Ellgas <rellgas@msegrp.com> <br /> To: "Conner, Anne P (CGT)" <APB1@pge.com>; Christine Gaber <COG3@pge.com>; Ralph Roberts <br /> 9/8/2009 <br />