My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
540
>
2300 - Underground Storage Tank Program
>
PR0541337
>
REMOVAL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 3:22:51 PM
Creation date
9/15/2020 10:14:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2019
RECORD_ID
PR0541337
PE
2361
FACILITY_ID
FA0023688
FACILITY_NAME
SPAULDING TRUST PROPERTY
STREET_NUMBER
540
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906039
CURRENT_STATUS
02
SITE_LOCATION
540 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH AND SAFETY PLAN <br /> Spalding Trust Property — 540 North Eldorado Street - UST Removal <br /> Page 3 of 6 <br /> Location Job Function Level of Protection <br /> Excavate , decontaminate <br /> Exclusion Zone A B C D Other <br /> UST , replace soils <br /> Reduction Zone Collect Samples , Log A B C D Other <br /> samples <br /> Support Zone Support Functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows : <br /> Level D <br /> • hard hat <br /> • steel -toed boots <br /> • half-faced respirator ( if necessary) <br /> • gloves <br /> • safety glasses <br /> If air purifying respirators are authorized , organic vapor and dust is the appropriate <br /> canister for use with the involved substances and concentrations . No down -grading <br /> changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader . <br /> 6 . 0 . ON -SITE WORK CREW <br /> Work crews consisting of two persons will perform the following tasks : <br /> PROJECT TEAM LEADER. TASK : <br /> FIELD CREW : TASK . <br /> Helper(s) Assist excavation crew <br /> Laboratory/Consultant Representative Collect and preserve soil samples <br /> The works party( ies) shall be briefed on the content of this plan prior to initiating onsite <br /> work . <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.