Laserfiche WebLink
U E042 <br /> UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page -I of 6) <br /> Type o;Action ❑ Installation Test ❑ Repair Test ❑ Six Month Test ❑x 36 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10198666 08/16/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Pacific Bell Telephone Co . dba AT&T California <br /> Business Site Address City ZIP Code <br /> 345 N . San Joaquin Stockton 95202 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) Phone # <br /> Jarrett Flewellyn (714) 560-8222 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 588098 8028164 2/20/2021 <br /> III . SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID : (By tank number, stored product, etc.) A UE0420001 B T-2 C T-3 D T4 <br /> Tank Containment <br /> Tightness Test Result El Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Product Piping Containment <br /> Tightness Test Result p Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ® NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail H NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail O NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vent Piping Containment <br /> Tightness Test Result ® Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail p NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail O NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail EI NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Turbine / Product Piping Sump <br /> Tightness Test Result p Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result F1 Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail [01 NA ❑ Pass ❑ Fail ❑ NA <br /> VENT / TRANSITION SUMP ID : a b C d <br /> Tightness Test Result E] Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA [I Pass ❑ Fail ❑ NA ❑ Pass [0:1Fail ❑ NA <br /> UDC ID : 1 2 3 4 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID : 5 6 7 8 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID : 9 10 11 12 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> All items marked "Fail" or "NA " must be explained in their respective "COMMENTS " section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> 1 hereby certify that the secondary containment was tested in accordance with California Code of Regulations , Title 23 , Division <br /> 3 , Chapter 16, Section 2637 and all the information contained herein is accurate . <br /> UST Service Technician Signature <br /> Check If Action Item (s ) Are Present <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, NA = Not Applicable, UDC = Under- <br /> D' riser Containment <br /> Dispenser <br />