My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:28:48 PM
Creation date
9/15/2020 3:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231995
PE
2361 - UST FACILITY
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1403 W COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200-17 <br /> pei.org10 <br />Underground Fiberglass Double and Triple-Wall <br />Tanks With Dry Annular Space FTPI 4/01/07. <br />4.2.7 Test Equipment. Test equipment shall <br />include: <br />• a vacuum-generating device that can be used in <br />a Class I, Division 1 area capable of pulling 15 <br />inches of mercury (Hg) vacuum; <br />• an automatic vacuum shutoff valve or vacuum <br />regulator (The shutoff valve can be set to <br />close at a predetermined safe level, preventing <br />the possibility of accidentally imposing a high <br />vacuum that could damage the tank. The use of <br />the valve is recommended because it limits the <br />vacuum that can be applied to the interstitial <br />space.); <br />• vacuum gauge with a range of 0 inches to 30 <br />inches Hg graduated in increments of 0.5 inches <br />Hg or less; <br />• toggle valve and vacuum hose; <br />• stopwatch or other time measurement device <br />capable of measuring a 1-second increment; <br />• plumber’s plug. <br />4.2.8 Test Procedure. <br />1.Install the plumber’s plug in the interstitial <br />riser(s) below any tees. <br />2.Connect the vacuum gauge, valve and the <br />vacuum-generating device to the fitting on the <br />plumber’s plug. The valve should be between <br />the vacuum source inlet and the pressure <br />gauge. The gauge should be between the valve <br />and the fitting so it will read the interstitial vac- <br />uum when the valve is closed. The automatic <br />vacuum shutoff valve is located at the inlet of <br />the vacuum-producing device and should be <br />set at a minimum of 10 percent and no more <br />than 2 inches Hg above the test vacuum. <br />3.Ensure all connections are airtight. <br />4.Start the vacuum-generating device, and open <br />the valve. <br />5.Pull the vacuum to 10 inches Hg. Close the <br />valve. <br />6.Allow the vacuum to stabilize for a minimum <br />of 5 minutes at the specified vacuum level. If <br />a stable vacuum cannot be maintained, test <br />equipment shall be inspected for leakage. <br />Repeat steps 4 and 5 until a stable vacuum is <br />achieved. If a stable vacuum cannot be main- <br />tained, the tank secondary containment integ- <br />rity test fails. <br />7.When the vacuum level stabilizes, record the <br />vacuum level and the test start time. <br />8.Observe the vacuum level for the period of <br />time shown in Table 4-1. <br />9.Record the final time and vacuum level. <br />10.Check the interstitial space for accumulation <br />of liquids. <br />TABLE 4-1 <br />Vacuum, <br />inches Hg <br />Capacity, <br />gallons <br />Duration, <br />hours <br />10 <br /><20,000 1 <br /> 20,000+ 2 <br />4.2.9 Pass/Fail Criteria. If there is no loss in <br />vacuum level, no liquids are drawn into the inter- <br />stitial space during the test duration shown in Table <br />4.1, and the tank secondary containment area has <br />no additional fluid than at the start of the test, then <br />the tank secondary containment passes the test. <br />If there is any vacuum lost during the test or liquids <br />are drawn into the interstitial space, then the tank <br />secondary containment fails the test. <br />4.3 Tank Secondary Containment Integrity Testing <br />— Liquid-Filled Test Method. <br />4.3.1 General. This test method tests the integ- <br />rity of the liquid-filled interstitial space. There are <br />a number of variables that affect this test, such as <br />interstitial space volume, temperature, water table <br />and product level in the primary tank. Refer to <br />Appendix A for specific manufacturers’ test proce- <br />dures. <br />4.3.2 Purpose. This general method is used to <br />test the integrity of the liquid-filled secondary con- <br />tainment of a UST. <br />4.3.3 Description of Test. Liquid is added to <br />the interstitial space of the tank and the level is <br />brought up into the interstitial riser. The liquid level <br />is monitored for a specified period of time. If the <br />liquid level is maintained, then the containment <br />system has passed the test.
The URL can be used to link to this page
Your browser does not support the video tag.