My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 5:07:46 PM
Creation date
9/15/2020 4:46:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232353
PE
2361
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
01
SITE_LOCATION
147 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMED Model All 00 Overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Flapper Valve Primary Float <br /> r � . <br /> Step 4 : Slowly insert the Model A0081 - Figure 3 : Hook end secured to the Figure 4 : Close- up <br /> 1101 test tool from the bottom of the underside of the flapper valve . <br /> lower tube until the hook end secures to <br /> the underside of the flapper valve . <br /> Refer to Figures 3 and 4 for details. <br /> Testing the Primary Float and Flapper Valve: <br /> # '_ ] Figure 5 : Primary float , down- <br /> y�ii ward position . <br /> Step 5 : With the flapper valve latched Step 6: Using a scribe move the pri- <br /> open , and the hook end secured , gently mary float upward to unlatch the flapper <br /> tug on the test tool , the flapper valve valve , and with the hook end secured , <br /> must remain open . gently tug on the test tool , the flapper <br /> valve must close , the test tool will move " <br /> about 3" downward . Refer to Figures Figure 6 : Primary float , upward <br /> 51 61 7 and 8 for details. position . <br /> •H ' <br /> � • j <br /> Figure 7 : Primary float upward , flapper Figure 8 : Primary float upward , flapper Step 7 : Using the scribe move the prk <br /> valve unlatched and closing . valve unlatched and closed . mary float downward . <br /> IMPORTANT: Perform steps 6 Step 10 : Re-install the fill adapter, cap <br /> through 8 a minimum of three times and spill container lid on the tank fill <br /> to assure the primary float, latch and riser. <br /> flapper valve components of the <br /> Model All100 OPV are operating prop - <br /> erly. <br /> Step 9 : Lift the Model A1100 OPV with <br /> the collar upward and re-install on the 2300 Industrial Park Dr. • Wilson , NC 27893 <br /> Step 8 : With the hook end secured , tank fill riser. Replace the drop tube 252"243-0150 • 252-243-4759 (fax) <br /> gently allow the flapper valve to move o- ring part number 569461 if damaged www,emcoretail .com <br /> upward and spring back into an open or missing . © 2018 Emco Wheaton Retail Corporation <br /> position , tug gently on the test tool , the <br /> flapper valve must relatch and remain , <br /> 08/ 18e <br /> 2 OS/ 18, Rev. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.