Laserfiche WebLink
Equipment <br /> EBW Phase I <br /> Required Inspection & Maintenance <br /> Spill Containment Manholes Drop Tube Mounted Overfill Prevention <br /> • Perform inspection and maintenance duties at least Valves <br /> once a year. • Perform inspection and maintenance duties at least <br /> • Remove any standing liquid and dispose of it properly. once a year. <br /> • Brush all buildup off of the brass drain valve screen ( if Inspect the inside of drop tubes for broken dip sticks or <br /> applicable) . noticeable damage to the valve flapper. If any damage is <br /> • Remove all dirt and foreign materials . observed , then the valve must be replaced . <br /> • Scrape all foreign materials away from the tank lid If it has not already performed during drain valve testing , <br /> sealing surfaces . leak test the Drop Tube assembly using the established <br /> • Should it be necessary to replace a drain valve due to "Pressure Integrity Test" for Drop Tube/ Overfill <br /> breakage or considerable contamination buildup , use Prevention Device (TP201 . 1 C or TP201 . 1 D) . <br /> EBW 70&337-19 Replacement Drain Valves only. EBW doesn 't require that the drop tube be pulled for <br /> • Perform a leak test using the established " Pressure inspection unless damage is noted . Should local authority <br /> Integrity Test" for a combination of Drop Tube , Drain require removal of the drop tube , the following seals and <br /> Valve , and Overfill Prevention Device (TP201 . 1 D ) . inspection steps are necessary: <br /> • Use 90079 Drop Tube Isolation Test Kit. Replace Drop Tube Isolation Gland ( if applicable) seal <br /> Rotatable Fill & Vapor Adapters , Dust Caps & kit-90090 <br /> Probe Riser Adapters Replace Drop Tube Flange Gasket — 111 82-01 <br /> • Perform inspection and maintenance duties at least Inspect the Tank Bottom Protector for freedom of <br /> once a year. movement. Repair or replace if necessary. <br /> • Inspect all product and vapor riser dust cap seals for Inspect OPD components , use instructions on EBW <br /> damage . If damage is observed , replace the seal with from 6329 . <br /> either the Aluminum Vapor Cap Seal or the Nylon Inspect drop tube joint sealant . Repair with EBW part # <br /> Product Cap Seal . 11372-01 only. <br /> • Perform Rotatable Adapter maintenance as specified by Ball Floats & Extractor Valve Bodies <br /> Phil-rite Enterprises , Inc . Perform established " Static • No annual maintenance is required . <br /> Torque Test" , TP201 . 1 B . <br /> • Pressure Vacuum Vent Valves <br /> Leak testing should be accomplished during the <br /> Pressure Integrity Test for a drain valve or Drop Perform the required maintenance as specified by <br /> Tube Mounted Overfill Valve , TP201 . 1 C or TP201 . 1 D . Musky Corporation . <br /> Annual maintenance of the probe riser cap assemblies At least once every three years , unless otherwise specified <br /> is normally not required . Whenever probe service is by a local authority, perform the established " Static <br /> necessary, inspect the service cap seal for damage and Pressure Performance Test" (TP201 . 3 ) . <br /> replace it , if necessary, at that time with a Probe Riser <br /> Cap Seal . <br /> Please contact Technical Support if assistance is needed . <br /> Franklin Fueling Systems <br /> 3760 Marsh Road <br /> Madison , WI 53718, U. S. A. <br /> Tel : + 1 608 838 8786 <br /> Tel: USA & Canada 1 800 225 9787 <br /> Tel: Mexico 001 800 738 7610 <br /> O 2015 F-6308 rev 3 www.franklinfueling.com <br />