Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ® 36 Month inspection <br /> 1. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10468777 10/10/2018 <br /> Business dame (Same as Facility Name or DBA-Doing Business As.) <br /> PaciIIc I vest Petroleum Inc. <br /> Busines$ Site Address City ZIP Code <br /> 550 W. Vai ico Rd . Tracy 195376 <br /> 11. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of JST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Guada LiDe Sanchez 925 470 - 0803 Ext. <br /> Contracts /Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 100546, 4 5250451 4/8/2019 <br /> Overfill P evention Equipment Inspection Training and Certifications (Ust applicable certifications.) <br /> Veed6il Root A30138 Expiresm 10/3012019 <br /> ! I III, OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method Used: ® Manufacturer Guidelines (Specify) Veeder Root Overfill Protection Testing CES 2018=02A <br /> ❑ Industry Code or Engineering Standard (Specify) <br /> ❑ Engineered Method (Specify) <br /> Attach the Inspection procedures and all documentation required to determine the results. # of Attached Pages: 11 <br /> Tank ID, (By tank number, stored product etc.) T1 : 87 T2 : 91 T3 : Diesel <br /> What is the tank inside diameter? (inches) 118 118 118 <br /> Is the fill piping secondarily contained? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No <br /> Veeder Root Veeder Root Veeder Root <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> response when activated? ® Restricts Flow ® Restricts Flow ® Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) ® AIV Alarm ® AN Alarm ® AN Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No <br /> At what level In the tank is the overfill prevention 99 98 99 <br /> set to activate? (inches from bottom of tank.) <br /> What is the percent capacity of the tank at which 90 90 90 <br /> the overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating ® Yes ® Yes ® Yes ❑ Yes <br /> condition to respond when the substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the appropriate level? (Specify in section V.) (Specify in sectiJV.) (Specify in section V.) (Specify in section V.) <br /> IV, SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fall <br /> V. COMMENTS <br /> All Items marked 7611" must be explained in this section. Any additional comments may also be provided here. <br /> E U a3 r <br /> N "tli C. I �� i� P�� AL i 7� k � 3im� <br /> VI, CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations, title 23, division 3, <br /> chapter 16, section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> if the facility has more components than this form adcommiodates, additional copies of this page may be attached. <br /> r`.FRR = i .M* rola Fmilm n wwftl Rarwfinn Rvdrwn in = kkud}Rrafinn 1 LST = I Irv1Pnwm uvl chnnvw tank W = Ar uflfaka cervi uku aal <br /> r <br />