My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013585
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2600 - Land Use Program
>
PA-2000133
>
SU0013585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:09 PM
Creation date
9/17/2020 1:48:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013585
PE
2627
FACILITY_NAME
PA-2000133
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220-
APN
01709051
ENTERED_DATE
8/18/2020 12:00:00 AM
SITE_LOCATION
18846 N HWY 99
RECEIVED_DATE
8/28/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Robert Vickery <br /> From: "Margaret Lagorio[EH]" <MLagorio@sjcehd.com> <br /> To: <A1rani123@aol.com>; <admin@ford-construction.com> <br /> Sent: Wednesday, April 23, 2008 2:46 PM <br /> Attach: Margaret Lagorio-04-23-08 -BG3MEPP.pdf <br /> Subject: 18846 N. Hwy 99, Stockton <br /> This information is regarding the injection well destruction at the AD <br /> above subject property. <br /> I was contacted by Rick Canepa back in January 2006 about destruction of <br /> the well. I E-mailed Liz Janes at USEPA about the destruction and was <br /> later contacted by George Robin of USEPA who said he was in c.RNact with <br /> Rick Canepa and Ford Construction on the destruction. <br /> On February 19, 2008, 1 received copies of letters from USEPA and Irani <br /> Engineering on the plugging and abandonment of the injection well. <br /> On April 2, 2008, I sent an E-mail to the above Irani E-mail address �. <br /> with the form and fees to be submitted to our office for issuance of a <br /> permit for destruction of the injection well prior to scheduling the <br /> work. <br /> On April 14, 2008, I was contacted by Liz Janes at USEPA that <br /> destruction of the well was starting. She gave me a cell phone number <br /> for Bill Reynolds who was at the site. I called him and told him a <br /> permit was required from our agency and that I had E-mailed this <br /> information to Irani. He said to E-mail it to Irani again and also gave <br /> me his E-mail. He assured me that they were only preparing (removing <br /> packing)for the destruction/abandonment and that there was time iZ?them <br /> to obtain the permit. <br /> I did not see the permit application until April 21, 2008 and when I <br /> looked up the contractor information on April 22, 2008, I found that <br /> Snow's Oilfield did not have a C-57 license as required by California <br /> Water Code and San Joaquin County Well Standards. When I called George <br /> Robin to discuss the status of the destruction I was very surprised to <br /> learn it had been completed without a permit or inspection from our <br /> agency. Especially,when it was our agency that was originally <br /> contacted regarding the destruction and thought everyone understood a <br /> permit and inspection was required by our agency. <br /> Attached are copies of the following document pages: San Joaquin County <br /> Ordinance Code Development Title Division 11, Section 9-1115.6 of the <br /> Code authorizing adoption of Well Standards, Section 9-1115.3 of the <br /> Code requiring obtaining a Well Permit from our agency for destruction <br /> of an injection well , Well Standards Section 2.1.1 requiring the permit <br /> be applied for by a C-57 licensed contractor, Well Standards Section <br /> 4/24/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.