My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 4:11:42 PM
Creation date
9/18/2020 2:46:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of B) <br /> XII . LINE LEAK DETECTOR TESTING_ <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) _ Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? © ❑ El <br /> all that apply ) Simulated leak rate verified: Z 3 GPH El 0. 1 GPH E] 0. 2 GPH <br /> Was the testing apparatus properly calibrated ? Q ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ✓❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ W] <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? © ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? © ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? © ❑ ❑ <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ✓❑ ❑ D <br /> For any answer of ` N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> X111v COMMENTS _ <br /> E <br /> XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used , (Do not complete this section) _ <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) © Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S- 1 REGULAR PRODUCT _ ® Pass ❑ Fail 0 Pass ❑ Fail <br /> S-2 REGULAR VAPOR <br /> © Pass ❑ Fail © Pass ❑ Fail <br /> S-3 REGULAR VENT © Pass ❑ Fail © Pass ❑ Fail <br /> S4 PREMIUM PRODUCT © Pass ❑ Fail © Pass ❑ Fail <br /> S-5 PREMIUM VENT © Pass ❑ Fail Pass ❑ Fail E <br /> S-6 DIESEL PRODUCT ©_Pass ❑ Fail W] Pass ❑ Fail <br /> S-7 DIESEL VENT © Pass ❑ Fail © Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑_Fail _❑ Pass ❑ Fail <br /> How was interstitial communication verified ? © Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? © Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> i <br /> i <br /> i <br /> i <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuun/Pressuretdrostatic, ID = Identification <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.