Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address : 4219 Morada Ln . , Stockton <br /> . . . - . . . . <br /> Car Wash. DSL STP: . . . <br /> . , . 208 <br /> TLS . . . 304, . . <br /> 8484 <br /> Store <br /> DSL Fill . . . <br /> 208 <br /> . . . 304 O . • • <br /> • . • . . . 303. . . . . <br /> 208 ; 2 . : 208 . 1. <br /> 4 & . 3 . & . 9L STP . VENTS <br /> 304 . X08. 208 <br /> 304 & • <br /> 8484 30 .4 <br /> 91• Fill . <br /> 208 2084 208 . <br /> 8 &' 7 6 . . & . 5. . . . . . . 304 F . . . . , . . . . . <br /> 304 3b4 . <br /> . 303 • <br /> . • 87 Fill <br /> 12 208 . li 10 . 208 . g • 208 . ; O . . . . . . . . <br /> 304 . <br /> & & <br /> 304 304 . . , V . . . . . . <br /> j <br /> , . . . 487. STP . . • . . <br /> 208 ,& , <br /> Piping is Estimated Only . 304 <br /> sasa . <br /> . . . <br /> I <br /> I <br /> Date map was drawn: 07/09/2019 <br /> I <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels ; sensors monitoring tank annular <br /> spaces , sumps , dispenser pans, spill containers , or other secondary containment areas; mechanical or electronic line leak <br /> detectors ; and in4ank liquid level probes (if used for leak detection) . In the space provided, note the date this Site Plan <br /> was prepared . Page 1 of 1 05100 <br /> i <br />