My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:47:21 AM
Creation date
9/18/2020 3:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PROCEDURE ONLY, FOR STANDARD MOD - STEP 3T : DETERMINE CABLE LENGTH <br /> ELS, PROCEED TO NEXT PAGE , Run cable along upper tube and over the top plate on <br /> the float bracket as shown . With the float in the down <br /> STEP 1T: INSTALL SOCKET ADAPTOR ASSY position (as shown in Figure 3T) align loop in cable with <br /> Put cable thru threads in inlet tube and out thru cable rivet and top hole in float bracket. Use the rivet as a <br /> port on side of inlet tube . Thread the socket adaptor template to size the loop in the cable and pull cable <br /> assembly finger tight into the inlet tube . Note : the ca - tight and crimp ferrule with crimping tool / pliers onto <br /> ble port on the inlet tube must be in line with the float cable at this location . Trim excess cable with wire cut- <br /> as shown previously in Figure 8A . ter / scissors . For reference, from the seam where the <br /> upper tube and valve body meet to the end of the cable <br /> Socket after trimming will require approximately 3 . 5 " of cable . <br /> adaptor <br /> _ Cable over float bracket <br /> assembly <br /> Cable Seam <br /> port <br /> I Figure 3T <br /> STEP 4T: ATTACH CABLE TO FLOAT BRACKET <br /> Figure 1T Ensure cable is over the float bracket . Using the sup- <br /> plied rivet align loop in cable with top hole in float <br /> STEP 2T: PASS CABLE THRU FERRULE bracket and pass rivet thru cable loop and float bracket <br /> Pass cable thru ferrule . Loop cable and then pass cable hole . Using rivet tool for 1 /8" dia mandrel attach rivet <br /> back thru ferrule . Keep ferrule loose until cable length and cable to the float bracket. See last page for list of <br /> is determined in the next step . Note : if cable end frays replacement cable parts . <br /> it may be necessary to trim the cable again to pass thru <br /> ferrule . Attach rivet to top hole <br /> 4and !k <br /> Figure 4T <br /> Trim STEP 5T: ENSURE PROPER CABLE OPERATION <br /> cable Unthread the socket adaptor assembly from the inlet <br /> after tube and ensure float and poppet move freely when <br /> step 3T socket adaptor assembly is pulled on . It should only <br /> require 3 " to 4" of movement in order to actuate the <br /> Figure 2T float and poppet. Thread socket adaptor assembly fin - <br /> ger tight into inlet tube after testing . <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.