My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200-17 — -- --— ._._.. -- -------- ---- ----- -——...---- --— <br /> 13.NVith the STP on and full pump pressure If the leak detector does not reset (trip) when the <br /> indicated, slowly open the test apparatus leak line pressure is bled off to zero, the MLLD fails <br /> orifice and direct the fuel flow into a test can. the test. <br /> 14.Ensure that fluid flow is passing through the If the STP does not properly cycle on/off under nor- <br /> pressure regulator to the leak orifice.With the mal fuel system operating conditions, the MLLD <br /> pressure regulator, adjust the line pressure to fails the test. <br /> 10 psig. Direct the fluid flow into a graduated <br /> cylinder and time for 60 seconds. Adjust the NOTE: If the leak detector initially fails, the <br /> size of the test apparatus leak orifice until the test procedure should be repeated to confirm <br /> desired leak rate of 189 ml/min is achieved the initial result. <br /> while maintaining a line pressure of 10 psig.It - --- — <br /> may be necessary to readjust the pressure regu- 9,1.8 Restore System to Operational Condi- <br /> lator and/or the test apparatus leak orifice sev- tion. Upon completion of the test: <br /> eral times in order to correctly set the leak rate <br /> at 189 ml/min at a line pressure of 10 psig. To Shut off power to the STP and perform lockout/ <br /> expedite calibration, make coarse adjustments tagout procedures on the circuit breakers.Allow <br /> by measuring the volume of fluid that corre- line pressure to bleed off to zero and close the <br /> sponds to 15 seconds(47 ml).The final calibra- shear valve. <br /> tion of the test apparatus leak orifice must be Remove the test apparatus from the shear valve <br /> conducted by measuring a fluid volume of 189 body and properly reinstall the plug into the <br /> ml over the full 60-second time frame. shear valve test port. <br /> 15.Turn the pump off and allow the line pressure • Reestablish power to the STP, tum dispenser <br /> to bleed off completely (0 psig) through the on and confirm that no leaks are present in the <br /> test apparatus leak orifice. This should cause system. <br /> the leak detector to "trip" (move into the leak <br /> sensing position). Do not change the size of Dispense product into the test can to remove any <br /> the test apparatus leak orifice after it has been air from the line and confirm that full product <br /> properly calibrated in Step 14. flow is achieved. <br /> 16.Redirect fluid flow to bypass the pressure 9.2 Electronic Line Leak Detectors(ELLDs). ELLDs <br /> regulator, and turn the pump on to allow the are commonly installed at the STP and can detect a leak <br /> simulated leak to occur through the calibrated in product piping between the ELLD and the solenoid <br /> test apparatus leak orifice. valve inside product dispensers. ELLDs trigger an alarm <br /> 3.7.Observe that the line pressure rises to the and may shut down the STP if a leak is detected. <br /> metering pressure determined in Step 11 and 9,2,1 General. Use this test procedure in con- <br /> remains there indefinitely with the pump junction with the ELLD manufacturer's installation <br /> running and the simulated leak occurring and maintenance instructions. <br /> through the calibrated test apparatus leak <br /> orifice.The metering pressure must remain for 9.2.2 Purpose. This test method is used to <br /> a minimum of 60 seconds. If the line pressure determine if an ELLD can detect a product line <br /> rises to the full pump pressure at any time leak equivalent to 3 gph at 10 psig. <br /> during the test, this indicates that the leak 9.2.3 Description of Test. A test apparatus is <br /> detector has fully opened and fails the test. <br /> typically connected to the test port on the shear <br /> 9.1.7 Pass/Fail Criteria. If line pressure does valve inside a dispenser to simulate a leak in the <br /> not increase above the metering pressure for the product line equivalent to 3 gph at 10 psig. The <br /> duration of the test with the simulated leak occur- performance of the line leak detector is observed <br /> ring, then the MLLD passes the test. to see if it detects the simulated leak. <br /> If the line pressure increases to full pump pressure 9.2.4 Test Equipment. Test equipment shall <br /> while the simulated leak is occurring, the MLLD include: <br /> fails the test_ a test apparatus that includes a pressure gauge <br /> ®i pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.