My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> Verify that the system setup parameters are correct <br /> (e.g., pipe diameter, pipe length, pipe material of <br /> construction, etc.). If any of the setup parameters <br /> are not correct, make any necessary changes to <br /> ELLD bring the system settings within specifications. <br /> 9.2.6 ELLD Test Procedure. <br /> NOTE This procedure describes calibration <br /> of the test apparatus leak orifice without the <br /> use of a pressure regulator. If you prefer to <br /> calibrate the leak orifice with the use of a <br /> pressure regulator, refer to the procedure <br /> 1, <br /> described in Section 9.1.6. <br /> FlGURE 9-2.The ELLD mounted In the submersible I.Shut off power to pump and perform lockout/ <br /> turbine pump will alarm on the console when a leak is tagout procedures on the circuit breakers. <br /> detected 2.Bleed line pressure to zero by activating the dis- <br /> penser and opening the nozzle,allowing fuel to <br /> drain into the test can.After all line pressure has <br /> measure STP pressure and an adjustable orifice <br /> to simulate a leak rate equivalent to 3 gph at 10 been bled off, hang up the nozzle and close the <br /> shear valve. <br /> psig; <br /> • time-measurement device capable of measuring 3.Connect.the test apparatus to the shear valve <br /> test port at the highest dispenser. If there is no <br /> a 1-second increment; elevation change, connect the test apparatus at <br /> • graduated cylinder for measuring leak rate; the farthest dispenser. , <br /> • 5-gallon metal test can. NOTE: If the piping has master/satellite dis- <br /> 9.2.5 Preparation. pensers,the test apparatus must be connected <br /> to the farthest satellite dispenser. <br /> NOTE:At locations with master/satellite fuel <br /> dispensing installations, the satellite may 4.Reestablish power to the pump. Open the shear <br /> not be protected by the ELLD. At locations valve and pressurize the line by activating the <br /> with a master/satellite fueling location, the pump. Confirm that no leaks are present in the <br /> test should be performed at the most distant test apparatus or the connection to the shear <br /> satellite dispenser so the entire piping system valve test port. <br /> is included. 5.Dispense product from the dispenser nozzle into <br /> the test can to remove all air from the line. <br /> NOTE ELLDs will turn the STP on and off 6.Close the dispenser nozzle and allow the line to <br /> multiple times while testing the simulated fully pressurize. Confirm that the line pressure <br /> leak. Ensure the test can will not overflow observed is the full pump pressure. <br /> during the test time. <br /> 7.Referencing the full pump pressure observed in <br /> Conduct the test at the dispenser that has the high- Step 6,determine from Table 9-1 the volume of <br /> est elevation in the system.If there is no difference fluid that must be discharged in 60 seconds at <br /> in elevation between dispensers, conduct the test full pump pressure to simulate a leak equivalent <br /> using the dispenser farthest from the STP. to 3 gph at 10 psig. <br /> Remove from service all dispensers connected to S.With the pump running and the line at full pump <br /> the STP being tested. pressure, slowly open the test apparatus leak <br /> orifice and adjust until the flow rate determined <br /> Verify that the STP relays are operating properly to in Table 9-1 has been achieved. <br /> ensure that the pump cycles on and off correctly. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.