Laserfiche WebLink
Fiber Glass Systems I KAY P odu�t on Solutions <br /> June 3, 2019 <br /> Site Location : <br /> Chevron <br /> Tracy, CA . 95377 <br /> Perthe general installation instructions, minimum clearance on pipe crossings is 2 .5". In a situation <br /> where 2.5" is not possible, crossings need to be padded with 1/z" or thicker rubber needs to be <br /> placed over the top of the lower pipe in the assembly. The bedding of the pipe must be done <br /> properly and special attention must be paid to make sure padding remains in place during the <br /> backfill process. The 2.5" clearance must be met on all pipe crossings, or the pipe padded per our <br /> instructions to satisfy NOV'S requirements. The workmanship and execution of the above is solely <br /> the responsibility of the contractor. <br /> Respectfu I ly yours, <br /> � ' 1a�ai �ame ,I <br /> Mrs. Lisa Blassingame <br /> Fuel Handling Sales Manager - US and Canada <br /> I <br /> T 210-842-5777 915 Audra St. <br /> F 210-247-0598 Cedar Park, Teras 78613 <br /> Lisa.Blassingame@nov.com <br />