Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ©Industry Standard ❑Professional Engineer <br /> E]Other(Spec) <br /> Test Method Used: 2]Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> Piping Run#87 Piping Run#91 Piping Run# Diesel Piping Run#Vapor Return <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith _ Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Aprox. 175' Aprox. 175' Aprox. 175' Aprox. 175' <br /> Product Stored: 87 Gas 91 Gas Diesel Vapor Return <br /> Method and location of Fiberglass Fittings/Air valve Fiberglass Fittings/Air valve Fiberglass Fittings/Air valve Fiberglass Fittings/Air valve <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 10:00am 10:00am 10:00am 9:45am <br /> Initial Reading(RI): 5 PSI 5 PSI PSI PSI <br /> Test End Time: 1 1:00am 11:00am 11:00am 10:45am <br /> Final Reading(RF): 5 PSI 5 PSI PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ❑✓ Pass ❑Fail 0 Pass ❑Fail ❑✓Pass ❑Fail ❑✓ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />