Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: El Piping Manufacturer ❑✓ Industry Standard ❑Professional Engineer <br /> ❑Other(Specie) <br /> Test Method Used: ❑✓ Pressure ❑Vacuum ❑Hydrostatic <br /> El Other(Spec) <br /> *Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> Piping Run#87 Vent Piping Run#91 Vent Piping Run#Diesel Vent Piping Run# <br /> al: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Aprox 70' Aprox 20' Aprox 20' <br /> Product Stored: Vent Vent Vent <br /> Method and location of Fiberglass Fittings/Air valve Fiberglass Fittings/Air valve Fiberglass Fittings/Air valve <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 9:30am 9:30am 9:30am <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 10:30am 10:30am 10:30am <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: QPass ❑Fail [DPass ❑Fail J Pass ❑Fail []Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />