Laserfiche WebLink
UNDERGROUND <br /> GE TANK <br /> OVERFILL PREVENTION EQUIPMENT NSPECT ON REPORT FORM (Page 1 of 1) <br /> Type of Action ❑InstaitationYtspeciton <br /> ❑Repair Inspection ®36 Month Inspection <br /> CERS ID <br /> I. FACILITY-INFORMATION <br /> --- -- <br /> - _ - - -- - __ ---- —. <br /> 10184563 Date of OvefiU Pd I <br /> revention Equipmernspection <br /> Business me(Satre as Faodrry Name or DBA-Doing Business As; 10/5/18 <br /> Chevron212470 _ <br /> Business Site Addrote -- -- <br /> - -- <br /> 3400 N MacArthur City zip code - ' <br /> -- Trac tom_ - 95376 <br /> II. UNDERGROUND STORAGE_ s <br /> cattor?TANK SERVICE TECHNICIAN INFO N <br /> Name of UST Serviee Technician Performing the Inspection(Print as shown on the/cc certibPhone <br /> Edwin Pineda (209) 65- 1246 <br /> ContractorrTank Tester Licenses ICC Certlfiestion! ICC Certification Expiration Date <br /> 743160 _ 8373052_ _j 6/26/19 <br /> Overfill Prevention E -_— <br /> qupment Inspection Training and Certifications(List applicable oerbficatrons <br /> Ill. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method Used. ®Manufacturer Guidelines(Specifo OPW <br /> ❑Industry Code or Engineering Standard(Specify) <br /> I <br /> ❑Engineered Method(Specify) <br /> Af�aeh the dns <br /> ------------- <br /> pecdoo procedures and all documentation raquked to determine Ehe results. sof Attached Pages <br /> It TT"ID (By(ank number. stored product.etc) T1_Prem T2 — T3 Diesel <br /> I What is the tank inside diametd7(tushes) --is the fill Aping secondarily contained? ®Yes ❑No ®Yes ❑No ❑Yes - <br /> ❑No ❑Yes ❑No <br /> Is the vent piping sieconderity contained? ❑Yes ®No ❑Yes ®No - <br /> ❑Yes ®No ❑Yes ❑No <br /> Overfill Prevention Equipmerd Manufacturer(s) OPw _ oPw <br /> What is the overfill prevention equipment ❑Shuts OH Flow $hofs Off Flow ❑Shama af<Alpo ❑Shuts Off Flow <br /> response when activated? Q Restricts Flow ®Restricts Flow <br /> (Check all that apply) ®Restricts Flow El Restricts Flow <br /> ❑AN Alarm ❑AN Alarm ❑AN Alarm ❑AN Alarm <br /> Are flow restrictors installed on vent v ——- <br /> PlPirr9 ®Yes -— <br /> ❑No ®Ysa ❑No �Yes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention — - —- <br /> �set to activate?(inches from bottom of tank) 105 1055' 106 <br /> What is the percent capacity of the tank at which -the overfill prevention equipment acbvetes*? 95 95 95 <br /> Is the overfill prevention in proper operating--- ®Yes Yes 0 Yes ❑Yes -- - <br /> condition to respond when the substance ❑No reaches the appropriate levet? ❑No ❑No ❑No <br /> (SprKYfy in section V) (Specify in section V 1 (Specify in eedion V) (spc jfy nxouun V) <br /> N. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ®Pass [I Fail 0 Pass ❑Fail ®Pass ❑Fail ❑p <br /> ❑Fail <br /> V. _COMMENTS <br /> Olt items marked'Fail-must be explained rn this section Any additional comments may also be prov ded h <br /> Site has both an external alarm and ball floats <br /> VI, <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING TO* <br /> �F H <br /> - - --- <br /> hereby certify all the overfill prevention equipment was inspected in accordance with California Code of Regulations,title 23,division 3, <br /> chapter is,section 26772 and all the information contained herein is accurate. <br /> UST Service Technician Signature -- <br /> M the(aciltty has mon conrporrants than this form accommodates,ad—di—do-nal copies of this page(nay be attached. -- ----- <br /> CERS a Cabornia ErNkorsnee Reporloig Syswm D a bwfl,_6on,UST a Undwgmutd storage iii,ICC_&iwnatkx Code Cenci Am=Aulibi a and venal <br /> s " <br />