My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 12:07:18 PM
Creation date
9/21/2020 11:54:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® El El <br /> all that apply.) Simulated leak rate verified: N 3 GPH ❑0.1 GPH El 0.2 GPH <br /> Was the testing apparatus properly calibrated? N ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ N <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? N ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? E ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? N ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? E ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? E ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? N ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? E ❑ ❑ <br /> For any answer of"N"above,describe in section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) N Vacuum ❑ Pressure N Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> L1 87A ANNULAR N Pass ❑ Fail ❑ Pass ❑ Fail <br /> L2 87B ANNULAR E Pass ❑ Fait ❑ Pass ❑ Fail <br /> L3 91 ANNULAR N Pass ❑ Fail ❑ Pass ❑ Fail <br /> L4 ADDITIVE ANNULAR E Pass ❑ Fail ❑ Pass ❑ Fail <br /> L5 87A FILL SUMP E Pass ❑ Fail N Pass ❑ Fail <br /> L7 87B FILL SUMP E Pass ❑ Fait N Pass ❑ Fail <br /> L9 91 FILL SUMP E Pass ❑ Fail N Pass ❑ Fail <br /> L11 ADDITIVE FILL/STP SUMP E Pass ❑ Fail N Pass ❑ Fail <br /> L12 ADDITIVE VENT SUMP E Pass ❑ Fail E Pass ❑ Fail <br /> S9 ADDITIVE PRODUCT E Pass ❑ Fail N Pass ❑ Fail <br /> S10 ADDITIVE VENT E Pass ❑ Fail E Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? N Simulated leak at far ends of the interstitial space. ❑Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? N Yes ❑ No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above,describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons per hour,Y=Yes,N=No,NA=Not applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.