Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> SPILL CONTAINER TESTING REPORT FORM (Pagel of 1) <br /> Type of Action ❑ Installation Test ❑Repair Test ®12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10146285 9/26/19 <br /> Business Name(Same as Facility Name or DBA-Doing Business As.) <br /> Costco#658 Tracy <br /> Business Site Address City ZIP Code <br /> 3250 West Grant Line Rd. Tracy 95377 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification.) Phone# <br /> Chad White (209) 532 - 7320 Ext. <br /> ContractorlTank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Ca623541/09-1747 8152115 2/23/2020 <br /> Spill Container Testing Training and Certifications(List applicable certifications.) <br /> Phil Tite #1015593710, ICC Service Technician #8152115 <br /> III. SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used: <br /> ®Manufacturer Guidelines:(Specify) 1 hour Lake Test <br /> ❑ Industry Code or Engineering Standard:(Specify) <br /> ❑Engineered Method:(Specify) <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Tank ID:(By tank number,stored product,etc.) 87a Fill 87b Fill 91 Fill Additive Fill <br /> Spill Container Manufacturer: Phil Tite Phil Tite Phil Tite OPW <br /> ❑ Non-Metallic ❑ Non-Metallic ❑ Non-Metallic ❑ Non-Metallic <br /> Method of Cathodic Protection 0 Isolation ® Isolation ®Isolation 0 Isolation <br /> ❑Other ❑Other ❑Other ❑Other <br /> (Specify in section V.) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> Inside Diameter of Spill Container:(Inches) 10.75 10.75 10.75 11 <br /> Depth of Spill Container:(inches) 14 14 14 14 <br /> Does the spill container have a 5 gallon capacity? ®Yes ❑ No ®Yes ❑No ®Yes ❑No ®Yes ❑ No <br /> ® Drain Valve ®Drain Valve ®Drain Valve ® Drain Valve <br /> Method to Keep Spill Container Empty ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump <br /> ❑Other ❑Other ❑Other ❑Other <br /> (Specify in section V.) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results ® Pass ❑ Fail 1 ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked"Fail"above must be explained in this section.Any additional comments may also be provided here. <br /> Replaced the drain valve on the 87a fill bucket. Also tightened the band clamp on the bottom of the Additive <br /> fill bucket. <br /> Both buckets passed after repairs. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations,title 23,division 3,chapter 16,section <br /> 2637.1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground storage tank,ICC=International Code Council <br />