My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 2:30:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 1 So LOWER TUBE ASSEMBLY FOR STANDARD VAPOR TIGHT MODELS, PROCEED <br /> If a vise is used, clamp on the valve body casting only to TO STEP 20 ON PAGE 14, <br /> avoid damage to the float and tubes . Thread the lower <br /> tube onto the valve body until the lower tube bottoms FOR TESTABLE MODELS, PROCEED TO PAGE 13o <br /> out on valve body. Tube can be tightened by hand or <br /> with a strap wrench. If a strap wrench is used try to po- <br /> sition It on the threaded Insert portion of the lower tube <br /> to prevent damaging the tube. <br /> Threaded Insert <br /> Figure 18 <br /> NOTE: Before installing the valve in the tank, a pres- <br /> sure test can be performed on the valve to check for <br /> vapor tightness. Seal off both ends of the tube with <br /> inflatable plumber's plugs. Apply a maximum 10" <br /> W,C. ('1 /3 PSI) air pressure. if pressure does not hold <br /> and a leak Can be located with soap solution, do not <br /> Install the valve. Send the valve back to OPW for <br /> warranty evaluation. <br /> I <br /> E CAUTION: Do not overmpressuriae. Excess pressure <br /> can damage the valve. <br /> STEP 19: CUT LOWER TUBE <br /> Measuring from the underside of the inlet tube flange, <br /> mark the overall length of the drop tube a distance of <br /> (B) minus 6' . Determine dimension (B) from the meas- <br /> urements taken in Step 1 , Figure 1 (Top of the Face Seal <br /> Adapter below the drain valve outlet in the spill con- <br /> tainer to the bottom of the tank). Saw off the excess <br /> tube at a 45-degree angle or per local codes or require- <br /> meets and file off any sharp burrs (Refer to Figure 24), <br /> Optional# Install the OPW Tank Bottom Protector <br /> on the lower tube (Refer to Installation instructions sup- <br /> plied with the Tank Bottom Protector) . <br /> IMPORTANT: Remove all chips and shavings out of <br /> the cut end of the tube. DO NOT remove chips and <br /> shavings by dumping thru valve body. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.